Front
11.
With Plywood positioned correctly on floor framing, attach with
1 1/4” screws
. Use screws every
16” (approximately 85 total). The Plywood is cut slightly smaller than floor framing. Keep plywood
seams tight.
Hint:
Use a chalk
line to mark location
of floor joists to
determine screw
placement.
Important:
Check to confirm that
your floor is level prior to proceeding
to the next step of wall assembly.
Front of Shed
(Doorway)
10.
Position
Plywood Floor
pieces
(6) on top of completed Floor Joists. Plywood will sit slightly
back from outside edge of Floor Joist Framing.
plywood
pushed together
at seams
141 1/2”
136 1/2”
Toll Free 1-888-658-1658 www.outdoorlivingtoday.com [email protected]
Page 10