25.
Position
Rear Top Plates
on top of wall studs
so they are flush on the inside with 2x3 wall stud.
The Top Plate is comprised of 3 pieces (2 outside
pieces with an angle cut on one end and a center
piece that is straight cut). Attach by screwing
down into top wall plate with
2 - 2” screws
per
plate.
24.
When all walls are attached together, check alignment with the floor. Bottom
wall plates should sit flush with outside of floor frame. When positioned correctly,
fasten bottom wall plates to floor using
4 - 2 1/2” screws
per wall panel.
Wall Plate
32” wide
Confirm 32” Wide Door
Opening at Top and Bottom.
Angle
screws into perimeter
Floor Joists.
Optional
- Caulking seams will
help prevent moisture from
entering your shed.
Caulking not included in kit.
Top Plates should be flush
with inside of wall framing.
Angle cut
on ends.
Hardware (Steps 24)
S1
- 2 1/2” Screws
x 32 total
Parts (Steps 25)
Rear Top Plates
(3/4” x 2 1/2” x 32”)
x 3
Hardware (Steps 25)
S3
- 2” Screws
x 6 total
Toll Free 1-888-658-1658 www.outdoorlivingtoday.com [email protected]
Page 20