manualshive.com logo in svg
background image

P 1

0644LOG133-V4 (5.8x5m)

0644LOG133-V4: 44mm cabin  

2mm Drill bit

Winter = High Moisture = Expansion

Summer = Low Moisture = Contraction

All buildings should be 

erected by two adults

For ease of assembly, you 

MUST pilot drill all screw 

holes and ensure all screw 

heads are countersunk.

For assistance please contact customer care on: 01636 821215

Mercia Garden Products Limited, 

Sutton On Trent, 

Newark, 

Nottinghamshire, 

NG23 6QN

www.merciagardenproducts.co.uk

CAUTION

Every effort has been made during the 

manufacturing process to eliminate the 

prospect of splinters on rough surfaces of the 

timber.  You are strongly advised to wear gloves 

when working with or handling rough sawn 

timber.

Please retain product label and instructions for future reference

             

General Instructions

BEFORE YOU START PLEASE READ INSTRUCTIONS CAREFULLY 

- Check the pack and make sure you have all the parts listed. 

- When you are ready to start, make sure you have the right tools at hand (not supplied) 

including  a Phillips screwdriver, Stanley knife, wood saw, step ladder and drill with 2mm 

bit.

- Ensure there is plenty of space and a clean dry area for assembly. 

TIMBER

As with all natural materials, timber can be affected during various weather conditions. 

For the duration of heavy or extended periods of rain, swelling of the wood panels may 

occur. Warping of the wood may also occur during excessive dry spells due to an interior 

moisture loss. Unfortunately, these processes cannot be avoided but can be helped. It is 

suggested that the outdoor building is sprayed with water during extended periods of 

warm sunshine and sheltered as much as possible during rain or snow. 

BUILDING A BASE

When thinking about where the building and base are going to be constructed: 

Ensure that there will be access (60cm) to all sides for maintenance work and annual 

treatment.

Ensure the base is level and is built on firm ground, to prevent distortion.  Refer to 

diagrams for the base dimensions. The base should be slightly smaller than the external 

measurement of the building, i.e. The cladding should overlap the base, creating a run 

off for water. It is also recommended that the floor be at least 25mm above the 

surrounding ground level to avoid flooding.

TYPES OF BASE

- Concrete 75mm laid on top of 75mm hard-core.

- Slabs laid on 50mm of sharp sand.

Whilst all products manufactured are made to the highest standards of Safety and in the 

case of childrens products independently tested to EN71 level, we cannot accept 

responsibility for your safety whilst erecting or using this product.

Refer to the instructions pages for your specific product code

For ease of assembly use a 

rubber mallet to fit the log 

boards. Do NOT use a heavy 

hammer.

Ensure to measure and check before cutting 

boards.

It is advisable to use a hand 

saw when cutting roof and 

floor boards.

To ensure log boards are even, use a spirit 

level to check each layer has been installed 

correctly.

Содержание 0644LOG133-V4

Страница 1: ...g excessive dry spells due to an interior moisture loss Unfortunately these processes cannot be avoided but can be helped It is suggested that the outdoor building is sprayed with water during extended periods of warm sunshine and sheltered as much as possible during rain or snow BUILDING A BASE When thinking about where the building and base are going to be constructed Ensure that there will be a...

Страница 2: ... 5800 Log Board 44x120x5000mm QTY 19 LB44 A 5000 Log Board 44x120x4120mm QTY 6 LB44 A 4120 Log Board 44x120x1685mm QTY 24 LB44 B 1685 Log Board 44x120x5000mm LB44 ADF 5000 Starter Board 44x66x5800mm LB44RT66 A 5800mm Log Board 44x120x5800mm QTY 19 LB44 A 5800 Roof Purlin A 45x120x5804mm QTY 4 F45120 A 5804 Roof Purlin B 45x120x5804mm F45120 AF 5804 5 a c b 133 Gable A 1106mm AI 0644LOG133HGRS V4 r...

Страница 3: ...oor Board 16x121x3849mm QTY 18 MB16 C 3849 Short Floor Board 16x121x2354mm QTY 64 MB16 C 2354 Eaves Frame 44x27x2900mm QTY 4 F2744 2900 Veranda Post 70x70x2001mm F7070 2001 Notched Fascia 16x120x2632mm QTY 4 S16120 2632 Angled Fascia 16x120x2916mm QTY 4 S16120 2916 Floor Bearer 44x58x2409mm QTY 8 F4458 2409 PT Floor Bearer 44x58x3503mm QTY 16 F4458 3503 PT Floor Bearer 44x58x1883mm QTY 18 F4458 18...

Страница 4: ...ed No 30 QTY 4 No 31 QTY 16 Following the same method as Step 1 create Base 2 by laying the bearers No s 30 31 onto a firm and level surface free from areas where standing water can collect as shown in the illustration Fix the framing together at each point using 2x70mm screws per side ensuring the frame is flush This will create half of base 2 Repeat this to create another base of the same size 6...

Страница 5: ...ach board are flush and level with the ends of the frame Fix each of the starter boards to the frame by screwing through the notch into the frame as shown in the illustration 6x70mm Screws 6 Step 5 Base Fix Once all four bases are assembled fix together using 100mm screws ensuring to stagger so as not to collide Make sure the bases are flush and level at the back 14x100mm Screws Pre drill hole 100...

Страница 6: ... 13 14 16 20 onto the assembly to create your second level Ensure that the boards are level and flush with each other as you lay each one Step 9 See Pre Assembly Parts needed No 13 QTY 6 No 14 QTY 6 No 16 QTY 6 No 18 QTY 12 No 19 QTY 12 No 20 QTY 12 Following the same method outlined in Pre Assembly lay the next 6 boards No s 13 14 16 18 19 20 onto the assembly to create your second level Ensure t...

Страница 7: ...8 19 20 onto the assembly to bring the board level to the top of the window and door frames Ensure that the boards are level and flush with each other as you lay each one Doors can be hung once the boarding has enclosed the door frame IMPORTANT Pre drill before fixing screws a a b c c Step 12 Parts needed No 35 QTY 14 Fix the Veranda Boards No 35 to the floor bearers using 8x30mm screws per board ...

Страница 8: ...Y 1 Following the same method outlined in Pre Assembly lay the next three boards No s 13 14 15 onto the assembly as shown in the illustration Ensure that the boards are level and flush with each other as you lay each one Fix the top section of the Post Plate No 36 to the base of the veranda post No 23 using 4x40mm screws as shown in the illustration Fix the bottom part of the post plate to the ver...

Страница 9: ...to ensure not to collide 6x70mm Screws IMPORTANT Pre drill before fixing screws Pre drill hole 70mm screw a b 3 11 a b Step 16 See Pre Assembly Parts needed No 4e QTY 1 No 5b QTY 1 Part No s 4e 5b are the second boards from the gable only gable is un fixed for assembly purposes rest these into position and secure through the notches in the board Ensure that the boards are level and flush with each...

Страница 10: ...void the boards splitting using 4x70mm screws per purlin Please note The gable shown is for illustrative purposes and may differ in width from your choice in product Nevertheless despite any differences the process of fixing the roof purlins is the same 20x70mm Screws 70mm screw IMPORTANT Pre drill before fixing screws a b a b Step 18 See Pre Assembly Parts needed No 4a QTY 1 No 4b QTY 1 No 4c QTY...

Страница 11: ... meet at the top of the apex The last board on each side will overhang Using a staight edge and a pencil mark out a line as a guide Cut along the pencil mark and remove the excess Place the cut down board s back onto the roof and secure into place using 4x40mm screws per board Please Note This image is for illustrative purposes and may differ from your choice in product Nevertheless the process of...

Страница 12: ... each individual board Do NOT secure the boards until the last board has been measured and cut Following the same method outlined in the previous step measure the gap between the bottom of the tongue on the last board placed and the log board Using a straight edge mark out the measurement onto the last floor board No s 28 29 and cut along the length removing the excess Please note Mark the final b...

Страница 13: ...ernal space 33 33 Pre drill hole 30mm screw trim to fit Step 24 Parts needed No 33 QTY 9 Inside the building place the closure trim No 33 against the boarding and align with the roof as shown in the illustration Once in position fix each trim into place by pre drilling a pilot hole and using 6x30mm screws per trim equally spacing them along the face of the board 54x30mm Screws 30mm screw Pre drill...

Страница 14: ...at the top of the apex 32x40mm Screws Pre drill hole 40mm screw 24 24 24 24 25 Step 28 Parts needed No 34 QTY 8 Arrange the storm braces No 34 around the building internally Place 2x storm braces per side fixing into place using 2x 90mm bolts per brace making sure the washer nut are tightened from the outside of the building Ensure the storm braces are secured at the highest point possible on each...

Отзывы: