Toll Free 1-888-658-1658 www.outdoorlivingtoday.com [email protected]
Page 15
Flush with bottom
of siding.
19.
Locate both pieces of
Side Wall Vertical Trim
.
Position pieces in siding gaps, and aligned flush with
the siding bottom. Attach with
4 - 2” Finishing Nails
per piece.
Hardware
N5 - 2” Finishing Nails
x 8 total
Parts
1D - Side Wall Vertical Trim
(1” x 1 1/2” x 27”)
x 2
20.
Next, position
Rear Wall Vertical Trim
in
siding gap, and flush with siding bottom as per
Step 19
. Attach with
4 - 2” Finishing Nails
.
Hardware
N5 - 2” Finishing Nails
x 4 total
Parts
2D - Rear Wall Vertical Trim
(1” x 1 1/2” x 24 3/4”)
x 1