6”
6”
Rear Roof Panel
Pilot Hole
first.
Front
Roof
Panel
Pilot Hole
first.
Toll Free 1-888-658-1658 www.outdoorlivingtoday.com [email protected]
Page 13
Pilot Hole
first.
Roof plywood overhangs Rafter by
1” on side when positioned evenly.
Rear
Roof
Panel
17.
With roof panels connected together, have a helper hold the back panel
with front panel resting on the rafters in an “A” shape as shown.
Position the roof evenly side-to-side and pre-drill shallow (1/8” deep) pilot holes
before attaching the hinges with
3 - 3/4” Black Screws
per Hinge.
Hardware
SB1 - 3/4” Black Screws
x 6 total
Pre-drill shallow pilot holes
(1/8” deep) for 3/4” screws.
Front edge
- bevel
shingles flush with
plywood edge.
Front Roof
Panel
Rear Roof
Panel
Bevel shingles overlapping.
16.
Locate
Rear Roof Panel
and
2 Black T Hinges
. Attach
hinges to the front edge of the Rear Roof Panel as shown
with
3/4” Black Screws
. The front edge is the one with bevel
shingles flush with the plywood edge.
Next, position the
Front Roof Panel
tight against the Rear
Roof Panel with bevel shingles overlapping. Attach other side
of hinges to the Front Roof Panel with
3/4” Black Screws
.
Hardware
Y1 - Black T Hinge
x 2 total
SB1 - 3/4” Black Screws
x 12 total
Parts
2C - Rear Roof Panel
(42” x 25 1/2”)
x 1
3C - Front Roof Panel
(42” x 24 1/2”)
x 1
Note:
helper needed
for this step.