Concrete Slab
Foundation
Hint:
Use a chalk line
to mark location of floor
joists to determine
screw placement.
Important - Make
sure floor is level
before moving on to
wall section. Use a
level to confirm, and
shim floor joists as
required.
push plywood
together at seams.
Front
5.
With Floor Runners attached, carefully flip the floor over and place
on your foundation.
Caution:
you will need 2 people to assist you.
Be careful when laying floor down not to bend or twist floor. When in
place, level floor completely.
6.
Position all
Large
&
Small Plywood Floor
pieces on top of completed Floor Joists.
Plywood will sit slightly back from outside
edge of Floor Joist Framing. When in correct
position, attach with
1 1/4” Screws
. Use
screws every 16”. The Plywood is cut slightly
smaller than floor framing. Keep plywood
seams tight.
Parts
Plywood Floor - Large
(48” x 74 7/8”)
x 2
Plywood Floor - Small
(8 7/8” x 74 7/8”)
x 1
Hardware
S2
- 1 1/4” Screws
x 40 total (approx)
7.
When completed, make sure
the floor is still level and make
adjustments if required. When
completed, your floor should look
similar to this.
Note:
The floor will be flipped over and floor
runners will sit on your foundation. It is
important to note that having a level foundation
is critical. Choosing a foundation will vary
between regions. Typical foundations can be
concrete pads or patio stones positioned
underneath the floor runners.
Foundations
Toll Free 1-888-658-1658 www.outdoorlivingtoday.com [email protected]
Page 9