Outdoor Living Today www.outdoorlivingtoday.com [email protected]
Page 9
A3.
With Floor Joist Frames positioned together flush, attach with
6 - 2 1/2” Screws
.
A4.
Position and attach
Floor Runners
(1 1/2” x 3 1/2” x 45 1/2”) to completed floor frames with
6 - 2 1/2” Screws
per Runner. Make sure Runners are flush with outside of floor framing but not
overhanging. Make sure 4th Runner is placed equally over seam where floor frames meet.
4th Runner
4th Runner
96”
45 1/2”
A5.
With Floor Runners attached, carefully flip the floor over and place on your foundation.
Caution -
you may need 2 people to assist you. Be careful when laying floor down not to bend or twist
floor.
Note:
The floor will be flipped over and floor runners will sit on your foundation. It is important
to note that having a level foundation is critical. Choosing a foundation will vary between regions.
Typical foundations can be concrete pads or patio stones positioned underneath the floor runners.
Flush with Floor Framing.