22.
When all walls are attached
together, check alignment with the
floor. Bottom wall framing should
sit flush with outside of floor joists.
When positioned correctly, fasten
bottom wall plates to floor using
4 - 2 1/2” screws
per wall panel
(48 total).
Confirm 64” wide
door opening at bottom.
Bottom Wall
Framing
Important:
If walls are not lining
up and appear higher or lower than
each other, please check the level
of your floor. You may need to
make slight adjustments before
proceeding.
Optional:
Caulking seams will
help prevent moisture from
entering your shed. Caulking
is included to complete roof
only. Additional Caulking may
be required.
Caulking
Angle
screws into perimeter
Floor Joists.
64”
Advice:
Prior to fastening walls and installing
rafters, take time to confirm your walls are
level, square and plumb.
Measure diagonal at top and bottom of walls
corner-to-corner. This should be approximately
189 3/8”. More importantly, if measurements
are not within 1/4”, your walls are not square.
Adjusting now will make it easier to the roof
section later
.
189 3/8”
189 3/8”
Toll Free 1-888-658-1658 www.outdoorlivingtoday.com [email protected]
Page 17