Parts (Step 56)
Vertical Door Trims
(1/2” x 3 1/2” x 85”)
x 2
Hardware (Step 56)
N1 - 1 1/2” Finishing
Nails
x 16 total
56.
Attach
Vertical Door Trim
on both sides of the
doorway. Position flush with
Door Jamb
and tight
underneath
Horizontal Gable Trim
. Secure each
piece with
8 - 1 1/2” Finishing Nails
per piece.
Parts (Step 57)
Facia Cleat
(3/4” x 1 1/2” x 40”)
x 8
Hardware (Step 57)
S2 - 1 1/4” Screws
x 24 total
57.
Attach
Facia Cleat
to underside of
Battens
, flush
edge to edge. Repeat this step on rear of shed. Fasten
each cleat with
3 - 1 1/4” screws
per piece.
Parts (Step 58, 60)
F&R Facia (angled ends)
(3/4” x 5 1/2” x 81 1/4”)
x 4
Hardware (Step 58, 60)
N1 - 1 1/2” Finishing Nails
x 40 total
58.
Attach
Front and Rear Facia (angle cut on ends)
, to
Facia Cleats
on front side, with
10 - 1 1/2” Finishing Nails
per piece. Line up Facia so Facia ends line up with
Rafter
ends.
Expert Advice:
Do a dry run by lining up Front, Rear and Side Facia to confirm positioning prior to
attaching
Toll Free 1-888-658-1658 www.outdoorlivingtoday.com [email protected]
Page 34