![Oliver 4275C Owner'S Manual Download Page 20](http://html1.mh-extra.com/html/oliver/4275c/4275c_owners-manual_3811424020.webp)
20 |
Page
Oliver Machinery
4275C Jointer
Removing Machine from Crate
When all items are ready for machine setup, attach the lifting sling to the lifting hooks located at the two
corners of the cabinet. Gently lift the machine from the pallet and move it to its final location.
WARNING
4275C Jointer has a net weight of 1109 lbs. All lifting devices must be capable to
handle the load, or serious personal injury and machine damage may occur.
IMPORTANT
Use the lifting hooks for lifting the jointer. Do not lift the machine by the tables as
it may alter the alignment of the tables.
Summary of Contents for 4275C
Page 2: ......
Page 10: ...10 Page Oliver Machinery 4275C Jointer Identification...
Page 11: ...4275C Jointer OLIVERMACHINERY NET 11 Page...
Page 52: ...52 Page Oliver Machinery 4275C Jointer Wiring Diagram For Stock 4275C 101 4S 230V 1Ph...
Page 53: ...4275C Jointer OLIVERMACHINERY NET 53 Page For Stock 4275C 102 4S 230 460V 3Ph...
Page 54: ...54 Page Oliver Machinery 4275C Jointer Parts List Fence Assembly...
Page 55: ...4275C Jointer OLIVERMACHINERY NET 55 Page Table and Cutterhead Assembly...
Page 56: ...56 Page Oliver Machinery 4275C Jointer Base Assembly...
Page 57: ...4275C Jointer OLIVERMACHINERY NET 57 Page Motor and Cabinet...
Page 66: ...66 Page Oliver Machinery 4275C Jointer Maintenance Record Date Task Operator...
Page 67: ...4275C Jointer OLIVERMACHINERY NET 67 Page Notes...