
Floor drain
The unit’s installation site must have a floor drain. The site’s floor should be inclined so
that any runoff from the unit leads towards the drain.
2.2 Dimensions, connections, and components
Components, ECO I
ECO I main patrs ver. 2
Pos.
Item
Description
Brine circuit side (evaporator)
In from the top, out from the bottom.
Heating side (condenser)
In from the bottom, out from the top.
WI
Heating water in (condenser in)
1 1/4" outer thread
WO
Heating water out (condenser out)
1 1/4" outer thread
BI
brine circuit in (evaporator in)
1 1/4" outer thread
BO
brine circuit out (evaporator out)
1 1/4" outer thread
AF
Leveling feet
M10, DIN/ISO 17/16 mm
TC
Switchboard cover (Torx T25)
The unit’s fuses and some of its terminal
blocks are located under this cover.
FC
Compressor unit front panel (Torx T25)
The unit’s switchboard is located behind this
cover.
HUB
EasyAce data hub
Behind a transparent panel (Torx T25)
12 (54)
M8003 2219EN
Summary of Contents for ECO Inverter+ 25
Page 1: ...M8003 2219EN 24 May 2022 INSTALLATION AND COMMISSIONING ECO Inverter 7 25...
Page 2: ......
Page 4: ...6 7 EU Product Data 52 2 54 M8003 2219EN...
Page 57: ......