OFITE, 11302 Steeplecrest Dr., Houston, TX 77065 USA / Tel: 832-320-7300 / Fax: 713-880-9886 / www.ofite.com
53
SGSM
Preparing the Test Cell
Fill Gauge
(#120-52-021)
3. Carefully screw the top cell cap onto the cell body completely. The cell
cap should turn smoothly onto the cell body. If you encounter resistance,
stop turning and unscrew the cap slightly. Then continue turning until it
tightens completely.
Unscrew the top cell cap ⅛ of a turn. This will facilitate disassembly later.
Filling the Cell
1.
Once the slurry has been mixed, place the fill gauge on top of the test cell.
2.
Fill the cell until the cement touches the bottom of the fill gauge to the
side labeled “SGSM”.