background image

 9 

 

Power Supply 
Insert plug into a 400 V socket which is protected by 3 x 63 A (slow). Only 
extension cables designed according to VDE to be used. Extension cables on 
reels to be reeled off during operation in order to avoid overheating of the reel. 
Plug, couplings to be watertight. A faulty current protection switch to be added. 
VDE regulations to be observed. 

 

High Pressure Connection 
Connect high pressure hose to high pressure outlet (11) respectively to tap 
point of the high pressure piping system by means of the hand nut without 
using tools. 

 

Pipe Cleaning Hose Connection (optional) 
Connect high pressure hose with high pressure water outlet (11) by means of 
the hand nut without using tools. Other end to be connected with required pipe 
cleaning nozzle hand tight without using tools. 

 

Operation 

  Fully open water source 

  Unlock and release spray pistol, bleed unit 

  Push ON/OFF switch (2).  

 

Be aware of significant recoil

. Ensure stable foothold. 

 

  Carry out cleaning task. 

 

Pressure Regulation  

The pressure can continuously be adjusted as required at the turning handle 
of the double lance. 

 
Counter-clockwise:

 pressure 

reduction 

Clockwise:

 pressure 

increase 

 
Pressure/Flow Regulation  

Pressure and flow rate can continuously be adjusted as required at the turning 
knob of the safety control valve. 

 
Counter-clockwise:

 

continuous pressure and flow reduction to minimum 
performance 

Clockwise:

 

continuous pressure and flow increase to maximum 
performance 

 

When pistol is closed, machine is electrically switched off 
after approx. 15 seconds (timer lag). Pressure is immediately 
generated when opening the spray pistol

 

During extended working breaks and after work the machine 
to be switched off by means of the ON/OFF switch (2)

 

 

 

 

 

Summary of Contents for S 323 VA

Page 1: ...to be read before initial start up Operation Manual S 323 VA S 323 VA H von Oertzen GmbH Ferdinand Harten Str 10 22949 Ammersbek Tel 49 40 604110 Fax 49 40 6041149 www oertzen gmbh de info oertzen gm...

Page 2: ...4 5 3 Design and Configuration Illustrations page 6 7 4 Start up Operation Shut down page 8 11 5 Maintenance and Care page 12 13 6 Electric Wiring Diagram page 14 7 Technical Data page 14 8 Trouble Sh...

Page 3: ...ery year by qualified personnel Inspection results to be recorded and to be made available to authorities their on request OERTZEN offers qualified service personnel to carry out safety inspections at...

Page 4: ...fective high pressure hoses often cause severe accidents during operation Therefore high pressure hoses to be carefully inspected before start up and replaced by original OERTZEN equipment in case of...

Page 5: ...serve marking approx 50 cm Strictly follow instructions in para Pipe Cleaning chapter Operation During loading hoisting device to be fastened properly at jack rings Ensure balanced load Repair work in...

Page 6: ...g pressure Downstream of the high pressure pump a locked and sealed safety control valve is installed which opens as soon as the operating pressure is exceeded by more than 10 and returns the water wh...

Page 7: ...7...

Page 8: ...n order to guarantee proper function and trouble free operation the following checks to be carried out during working Observe function of indicator lights monitors Observe pressure variations Observe...

Page 9: ...e hand tight without using tools Operation Fully open water source Unlock and release spray pistol bleed unit Push ON OFF switch 2 Be aware of significant recoil Ensure stable foothold Carry out clean...

Page 10: ...re Pipe Cleaning Option During the pipe cleaning procedure aerosols may be formed so that wearing a protective mask is recommended Push pipe cleaning hose with nozzle into the pipe up to the marking a...

Page 11: ...OERTZEN high pressure hoses to be used Otherwise Declaration of Conformity and warranty will expire Reel up high pressure hose properly without any loops Store machine and accessories in a dry frost p...

Page 12: ...ions at attractive prices In order to guarantee reliability and trouble free operation of the machine it is of vital interest to follow the instructions below If the required maintenance intervals are...

Page 13: ...to be protected as described below Mix 2 l of a 1 1 water anti freeze liquid e g Glysantin in a clean vessel dip water connecting hose into anti freeze liquid and start pump Open spray pistol stop va...

Page 14: ...83 N Suction height 1 m 1 m Electric connection 3 400 V 50 Hz 3 400 V 50 Hz Fuse slow 3 x 16 A 3 x 16 A Motor rating 6 5 PS 10 PS Total power connected 6 5 kW 8 9 kW Detergent dosing rate 10 10 Spray...

Page 15: ...protection switch defective Operating pressure high Eliminate cause and re start machine with ON OFF switch Replace fuse If it burns again or motor is noisy call qualified service Ensure correct power...

Page 16: ...16...

Reviews: