Start-up / Shut-down

 

Before Start-up:

 

 

Read and observe operation manual. 

 

In order to guarantee proper function and trouble-free operation, the 
following checks to be carried out before start-up: 
 

  General condition of the unit (connections, gaskets, etc.). 

 Power 

cables/connections. 

  High pressure hoses, hose pipes, whether damaged. 

  Air supply, fresh air grill must not be covered. 

  Filling of consumables. 

  Correct oil level of high pressure pump (sight glass/dip stick).  

  High pressure pump: special pump oil OERTZEN OSP.  

  Pump/pump connections whether leaking. 

  Machine only to be run with absolutely clean water. Before connecting 

the water supply hose, rinse it thoroughly. Depending on feed water 
quality, regularly check water filter in short intervals, replace if needed. 

  Machine only to be run horizontally (+/- 5°). 

 

In order to guarantee proper function and trouble-free operation, the 
following checks to be carried out during working: 
 

  Observe function of indicator lights/monitors. 

  Observe pressure variations 

  Observe leaks at high pressure pump, hose pipes, connections. 

  Observe unnormal noise. 

 
In case of malfunctions immediately stop machine, eleminate cause according 
to chapter „Trouble Shooting“, call qualified service. 

 

Connections 
 

Water Supply 
Connect water inlet (6) of the machine to water source with a clean hose 
(diameter see table below). Before connecting water supply hose, rinse it 
thoroughly. In case of connection to the potable water distribution, observe 
DIN 1988 (for momentary connections use a backflow preventer with non-
return function and ventilation). 
 

 

Flow pressure 

Min. flow rate * 

minimum:  2 bar 

 15 l/min 

"    water supply hose 

maximum: 8 bar 

 21 l/min 1"     water supply hose 

 

 30 l/min 1 

" water supply hose 

 

* see Technical Data 

 
Insufficient water supply will cause heavy damage on high 
pressure pump (cavitation). 

 

 

 

 

 

 

 

Summary of Contents for S 323 VA

Page 1: ...to be read before initial start up Operation Manual S 323 VA S 323 VA H von Oertzen GmbH Ferdinand Harten Str 10 22949 Ammersbek Tel 49 40 604110 Fax 49 40 6041149 www oertzen gmbh de info oertzen gm...

Page 2: ...4 5 3 Design and Configuration Illustrations page 6 7 4 Start up Operation Shut down page 8 11 5 Maintenance and Care page 12 13 6 Electric Wiring Diagram page 14 7 Technical Data page 14 8 Trouble Sh...

Page 3: ...ery year by qualified personnel Inspection results to be recorded and to be made available to authorities their on request OERTZEN offers qualified service personnel to carry out safety inspections at...

Page 4: ...fective high pressure hoses often cause severe accidents during operation Therefore high pressure hoses to be carefully inspected before start up and replaced by original OERTZEN equipment in case of...

Page 5: ...serve marking approx 50 cm Strictly follow instructions in para Pipe Cleaning chapter Operation During loading hoisting device to be fastened properly at jack rings Ensure balanced load Repair work in...

Page 6: ...g pressure Downstream of the high pressure pump a locked and sealed safety control valve is installed which opens as soon as the operating pressure is exceeded by more than 10 and returns the water wh...

Page 7: ...7...

Page 8: ...n order to guarantee proper function and trouble free operation the following checks to be carried out during working Observe function of indicator lights monitors Observe pressure variations Observe...

Page 9: ...e hand tight without using tools Operation Fully open water source Unlock and release spray pistol bleed unit Push ON OFF switch 2 Be aware of significant recoil Ensure stable foothold Carry out clean...

Page 10: ...re Pipe Cleaning Option During the pipe cleaning procedure aerosols may be formed so that wearing a protective mask is recommended Push pipe cleaning hose with nozzle into the pipe up to the marking a...

Page 11: ...OERTZEN high pressure hoses to be used Otherwise Declaration of Conformity and warranty will expire Reel up high pressure hose properly without any loops Store machine and accessories in a dry frost p...

Page 12: ...ions at attractive prices In order to guarantee reliability and trouble free operation of the machine it is of vital interest to follow the instructions below If the required maintenance intervals are...

Page 13: ...to be protected as described below Mix 2 l of a 1 1 water anti freeze liquid e g Glysantin in a clean vessel dip water connecting hose into anti freeze liquid and start pump Open spray pistol stop va...

Page 14: ...83 N Suction height 1 m 1 m Electric connection 3 400 V 50 Hz 3 400 V 50 Hz Fuse slow 3 x 16 A 3 x 16 A Motor rating 6 5 PS 10 PS Total power connected 6 5 kW 8 9 kW Detergent dosing rate 10 10 Spray...

Page 15: ...protection switch defective Operating pressure high Eliminate cause and re start machine with ON OFF switch Replace fuse If it burns again or motor is noisy call qualified service Ensure correct power...

Page 16: ...16...

Reviews: