background image

 3 

 

1. 

Introduction

 

By buying the OERTZEN equipment you have purchased one of the most 
durable and reliable high pressure cleaners available on the market. Its 
balanced ratio of water flow (temperature) and working pressure perfectly 
meets all cleaning requirements. The OERTZEN high pressure cleaners and 
accessories conform to all European safety regulations which is guaranteed by 
the CE symbol on the type plate. A Declaration of Conformity is part of this 
manual. 
 

  This manual to be made available to the operating personnel and to be 

read completely before start-up. We point out that we cannot be held 
responsible for any damage or malfunctions as a result of ignoring this 
manual. 

 

  According to the Directive for Use of Liquid Blasters (ZH 1/406) the 

machine described in this manual to be inspected every year by 
qualified personnel. Inspection results to be recorded and to be made 
available to authorities their on request. OERTZEN offers qualified 
service personnel to carry out safety inspections at attractive prices. 

 

  The packing materials (plastic foil, wood, cardboard boxes, nails etc.) 

are potentially dangerous, should be kept away from children and 
disposed according to environmental requirements.

 

 

This symbol appears at all operating and safety instructions 
dealing with risks for personal entirety and life. 
 
This warning symbol appears in the operating manual at all 
operating safety instructins dealing with risks due to electric 
power. 

 

This symbol appears at all operating and safety instructions 
dealing with the fulfilment of rules, regulations and instructions for 
the proper operation and destruction of the machine. 
 
This manual is subject to technical alteration. 

 
All rights reserved. Any use in other than legally authorised cases requires the 
written approval of ARNDT H. von OERTZEN (GmbH&Co). 

 

 
 

 

 

 

Summary of Contents for S 323 VA

Page 1: ...to be read before initial start up Operation Manual S 323 VA S 323 VA H von Oertzen GmbH Ferdinand Harten Str 10 22949 Ammersbek Tel 49 40 604110 Fax 49 40 6041149 www oertzen gmbh de info oertzen gm...

Page 2: ...4 5 3 Design and Configuration Illustrations page 6 7 4 Start up Operation Shut down page 8 11 5 Maintenance and Care page 12 13 6 Electric Wiring Diagram page 14 7 Technical Data page 14 8 Trouble Sh...

Page 3: ...ery year by qualified personnel Inspection results to be recorded and to be made available to authorities their on request OERTZEN offers qualified service personnel to carry out safety inspections at...

Page 4: ...fective high pressure hoses often cause severe accidents during operation Therefore high pressure hoses to be carefully inspected before start up and replaced by original OERTZEN equipment in case of...

Page 5: ...serve marking approx 50 cm Strictly follow instructions in para Pipe Cleaning chapter Operation During loading hoisting device to be fastened properly at jack rings Ensure balanced load Repair work in...

Page 6: ...g pressure Downstream of the high pressure pump a locked and sealed safety control valve is installed which opens as soon as the operating pressure is exceeded by more than 10 and returns the water wh...

Page 7: ...7...

Page 8: ...n order to guarantee proper function and trouble free operation the following checks to be carried out during working Observe function of indicator lights monitors Observe pressure variations Observe...

Page 9: ...e hand tight without using tools Operation Fully open water source Unlock and release spray pistol bleed unit Push ON OFF switch 2 Be aware of significant recoil Ensure stable foothold Carry out clean...

Page 10: ...re Pipe Cleaning Option During the pipe cleaning procedure aerosols may be formed so that wearing a protective mask is recommended Push pipe cleaning hose with nozzle into the pipe up to the marking a...

Page 11: ...OERTZEN high pressure hoses to be used Otherwise Declaration of Conformity and warranty will expire Reel up high pressure hose properly without any loops Store machine and accessories in a dry frost p...

Page 12: ...ions at attractive prices In order to guarantee reliability and trouble free operation of the machine it is of vital interest to follow the instructions below If the required maintenance intervals are...

Page 13: ...to be protected as described below Mix 2 l of a 1 1 water anti freeze liquid e g Glysantin in a clean vessel dip water connecting hose into anti freeze liquid and start pump Open spray pistol stop va...

Page 14: ...83 N Suction height 1 m 1 m Electric connection 3 400 V 50 Hz 3 400 V 50 Hz Fuse slow 3 x 16 A 3 x 16 A Motor rating 6 5 PS 10 PS Total power connected 6 5 kW 8 9 kW Detergent dosing rate 10 10 Spray...

Page 15: ...protection switch defective Operating pressure high Eliminate cause and re start machine with ON OFF switch Replace fuse If it burns again or motor is noisy call qualified service Ensure correct power...

Page 16: ...16...

Reviews: