Ensure the maximum room temperature does
not exceed 30°C.
Installation must take place on an even, horizon-
tal surface. The place of installation must con-
form to the static requirements of the heat pump
(pressure stress due to point loading of the feet).
OCHSNER cannot assume any warran-
ty for sinking due to a foundation that
was sized too small!
Fig. 3:
Minimum clearance to the sides.
Fig. 4:
Minimum clearances to front and rear.
Placement of the unit should be such that servic-
ing and maintenance are possible. The overlap
must be ca. 250 cm.
The heat pump must be acoustically de-coupled
from the floor. Reverberant rooms can lead to
increased noise perception. A possible transfer of
noise to adjacent rooms cannot be ruled out and
should be considered when planning the system.
The higher the heating capacity of the heat
pump, the greater the noise emission from the
heat pump's compressor.
Installing the free-air system
The installation of the split outside unit (evapora-
tor) is only permitted in free air and must be car-
ried out in such a way that the air flow is unhin-
dered on all sides. The following installation in-
structions are valid for the
three-fold split evapo-
rator VHS 80
with the AIR 80 C13A and
both
double split evaporators VHS-M 80
with AIR 80
C22A.
Fig. 5:
Installation variant not permitted
The minimum clearance to walls must be adhered
to (Fig. 6)
-
Clearance to wall (long side):
10cm or more than 100cm
-
Lateral clearance of the short sides to wall:
100cm
-
Clearance between two evaporators:
100cm on all sides
NOTE
The connecting side for the evaporator
pipework must be accessible without
danger throughout the year.
Summary of Contents for AIR 80 C13A
Page 2: ...BA_AIR_80_C13A_AIR_80_C22A_OTE3_SW5x_EN_V07 docx Page 2 of 68...
Page 46: ...BA_AIR_80_C13A_AIR_80_C22A_OTE3_SW5x_EN_V07 docx Page 46 of 68...
Page 47: ...BA_AIR_80_C13A_AIR_80_C22A_OTE3_SW5x_EN_V07 docx Page 47 of 68...
Page 48: ...BA_AIR_80_C13A_AIR_80_C22A_OTE3_SW5x_EN_V07 docx Page 48 of 68...
Page 49: ...BA_AIR_80_C13A_AIR_80_C22A_OTE3_SW5x_EN_V07 docx Page 49 of 68...
Page 50: ...BA_AIR_80_C13A_AIR_80_C22A_OTE3_SW5x_EN_V07 docx Page 50 of 68...
Page 52: ...BA_AIR_80_C13A_AIR_80_C22A_OTE3_SW5x_EN_V07 docx Page 52 of 68...
Page 53: ...BA_AIR_80_C13A_AIR_80_C22A_OTE3_SW5x_EN_V07 docx Page 53 of 68...
Page 54: ...BA_AIR_80_C13A_AIR_80_C22A_OTE3_SW5x_EN_V07 docx Page 54 of 68...
Page 55: ...BA_AIR_80_C13A_AIR_80_C22A_OTE3_SW5x_EN_V07 docx Page 55 of 68...
Page 56: ...BA_AIR_80_C13A_AIR_80_C22A_OTE3_SW5x_EN_V07 docx Page 56 of 68...
Page 62: ...BA_AIR_80_C13A_AIR_80_C22A_OTE3_SW5x_EN_V07 docx Page 62 of 68 13 Declaration of Conformity...
Page 63: ...BA_AIR_80_C13A_AIR_80_C22A_OTE3_SW5x_EN_V07 docx Page 63 of 68...
Page 64: ...BA_AIR_80_C13A_AIR_80_C22A_OTE3_SW5x_EN_V07 docx Page 64 of 68 14 ERP Data...
Page 65: ...BA_AIR_80_C13A_AIR_80_C22A_OTE3_SW5x_EN_V07 docx Page 65 of 68...
Page 67: ...BA_AIR_80_C13A_AIR_80_C22A_OTE3_SW5x_EN_V07 docx Page 67 of 68...