Setting the flow rate
) is to be ensured in all types of operation /hot water charging, heating,
cooling via a separate buffer tank etc.). The flow rates are measured by the installed flow meter and dis-
played on the OTE control. The flow rate is adjusted by means of the adjustment screw on the circulation
pump supplied. For a hydraulic regulation corresponding to the standards, especially with combined heat-
ing rsp. heating/cooling operation with hot water heating, appropriate pipe-run regulating valves are to be
fitted and the system calibrated as required.
Procedure:
1) Switch on the buffer charge pump (heat generator pump) via the relay test.
2) The
measured flow rate
is displayed, this must correspond to the nominal flow.
Fig. 39:
Reading flow rate
AIR 80 C13A (OLWP 65 plus), AIR 80 C22A
Flow rate sensor
Type
DN 50 kvs 40
Delta-p for nominal flow rate
mbar
100.0
Nominal flow rate
m³/h
13.0
Nominal flow rate
l/min
216.7
Minimum flow rate
l/min
108.0
Table 9:
Heat use system nominal flow rate
HEAT PUMP
ESC
ENTER
Main menue
HEATING CIRCUIT 1
HEATING CIRCUIT 2
HOT WATER
HEAT PUMP
ESC
ENTER
1
OCHSNER OTE
MENU
Sa 20.07.2013
15:41
Heating m ode
HEAT PUMP
operation mode
operational data
settings
relais test
ESC
ENTER
HEAT PUMP
01-022
Pump heat gener
0
01-076
Compressor
0
01-077
Heat source pum
0
ESC
ENTER
100%
ESC
01-022
HEAT PUMP
Pump heat generator
HEAT PUMP
ESC
ENTER
Main menue
HEATING CIRCUIT 1
HEATING CIRCUIT 2
HOT WATER
HEAT PUMP
ESC
ENTER
1
HEAT PUMP
operation mode
operational data
ESC
ENTER
settings
relay test
HEAT PUMP
00-071
Actual tempera 11.6
02-080
Operating cycle 23.4
02-081
Operating hours 15
21-002
Flow rate heat
4.0
ESC
ENTER
21-002
HEAT PUMP
Flow rate heating
23.4 l/min
ESC
OCHSNER OTE
MENU
Sa 20.07.2013
15:41
Heating m ode
Summary of Contents for AIR 80 C13A
Page 2: ...BA_AIR_80_C13A_AIR_80_C22A_OTE3_SW5x_EN_V07 docx Page 2 of 68...
Page 46: ...BA_AIR_80_C13A_AIR_80_C22A_OTE3_SW5x_EN_V07 docx Page 46 of 68...
Page 47: ...BA_AIR_80_C13A_AIR_80_C22A_OTE3_SW5x_EN_V07 docx Page 47 of 68...
Page 48: ...BA_AIR_80_C13A_AIR_80_C22A_OTE3_SW5x_EN_V07 docx Page 48 of 68...
Page 49: ...BA_AIR_80_C13A_AIR_80_C22A_OTE3_SW5x_EN_V07 docx Page 49 of 68...
Page 50: ...BA_AIR_80_C13A_AIR_80_C22A_OTE3_SW5x_EN_V07 docx Page 50 of 68...
Page 52: ...BA_AIR_80_C13A_AIR_80_C22A_OTE3_SW5x_EN_V07 docx Page 52 of 68...
Page 53: ...BA_AIR_80_C13A_AIR_80_C22A_OTE3_SW5x_EN_V07 docx Page 53 of 68...
Page 54: ...BA_AIR_80_C13A_AIR_80_C22A_OTE3_SW5x_EN_V07 docx Page 54 of 68...
Page 55: ...BA_AIR_80_C13A_AIR_80_C22A_OTE3_SW5x_EN_V07 docx Page 55 of 68...
Page 56: ...BA_AIR_80_C13A_AIR_80_C22A_OTE3_SW5x_EN_V07 docx Page 56 of 68...
Page 62: ...BA_AIR_80_C13A_AIR_80_C22A_OTE3_SW5x_EN_V07 docx Page 62 of 68 13 Declaration of Conformity...
Page 63: ...BA_AIR_80_C13A_AIR_80_C22A_OTE3_SW5x_EN_V07 docx Page 63 of 68...
Page 64: ...BA_AIR_80_C13A_AIR_80_C22A_OTE3_SW5x_EN_V07 docx Page 64 of 68 14 ERP Data...
Page 65: ...BA_AIR_80_C13A_AIR_80_C22A_OTE3_SW5x_EN_V07 docx Page 65 of 68...
Page 67: ...BA_AIR_80_C13A_AIR_80_C22A_OTE3_SW5x_EN_V07 docx Page 67 of 68...