94
Chapter 6 Maintenance
Install New Stitch Wire
Feed the Stitch Wire
[61]
4
Close the folder cover..
5
Close the connecting bridge
cover.
Step
Action
Information
Step
Action
Information
1
Touch START
.
3
Set the number of stitches to 6 (
see ‘Job Setting for a Standard Paper
4
Hand-feed or print an A4 or
larger size test job..
The stitch wire loads automatically
during the stitch head cycle.
5
Check the stitch wire is
loaded.
Check that a stitch is made. If needed,
repeat the previous step.
6
Reset the number of stitches
on the touch screen.
Summary of Contents for BLM 500
Page 1: ...Oc BLM500 Oc User manual Bookletmaker Oc BLM500...
Page 5: ...5 Chapter 1 Introduction to the Oc BLM500...
Page 20: ...20 Chapter 2 How to run the Oc BLM500 Run the Job...
Page 21: ...21 Chapter 3 The User Interface...
Page 46: ...46 Chapter 4 Standard Tasks Operate the Oc BLM500 offline...
Page 76: ...76 Chapter 5 Error Conditions Problems and Solutions Manually park the Shuttle...
Page 77: ...77 Chapter 6 Maintenance...
Page 95: ...95 Appendix A Specifications...
Page 98: ...98 Appendix A Specifications Specifications...
Page 99: ...99 Appendix B Declaration of Conformity...
Page 101: ...101 Appendix C Miscellaneous...