P1PVKY / P1PVCDKY
Installation & Service Instructions
030099-347
pg 10 of 14
© Copyright 2007 OASIS Corporation
2.
At the customer’s premises, ensure that there are no marks or visible damage to the carton
3.
Remove the cooler from the carton
4.
Remove the shipping bag from the cooler
5.
Carry out a general inspection of the cooler, ensuring that :
a)
There are no marks or physical damage to the cooler.
b)
That all accessories are present.
c)
That all the wires and electrical connections are in place at the back of the cooler.
d)
That the cooler is clean and dust free.
e)
Site the machine as close to the electrical and mains drinking water supply as possible with a
50mm air gap at both sides and back of the machine. Mount the machine on a firm flat surface
so that it cannot topple over. Please remember that the machine should not be exposed to direct
sunlight or heat sources above 32 degrees C.
f)
It is advisable that the water supply and electrical supply be within 2 meters of the machine for
ease of installation.
g)
Level the machine using the adjustable feet.
6.
Connect the water cooler to a potable mains water supply. OASIS recommend the use of an EPDA
recognised installation kit that includes a pressure reducing valve, shut off valve and a non return
valve. These should be fitted before the water intake to the machine. Minimum operating pressure
for the machine to work suitably is 1.5 bar. The ideal operating pressure is 3 bar
7.
Inspect the electrical socket, the machine plug and the power cable for any transit damage. Now
plug the power lead into the back of the machine. As soon as you plug the machine into a suitable
power supply, then you can start to flush water through the machine.
8.
Press the dispensing water for ambient temperature water and keep the button depressed until the
water from the outlet runs clear
9.
Press the dispensing water for cold temperature water and keep the button depressed until the water
from the outlet runs clear – note that it will take some time to bleed all of the air from the cooling
tank
10.
Carry out a visual inspection for any water leaks
11.
The direct chill system will start cooling immediately and is now ready for use by the customer