CX Logix Operation MANUAL
– Updated July 2022
Page 8 of 15
STEP 4
Fit the CLEAR faucet tee c/w injection valve to the pool water line, avoiding high pressure
areas (i.e., after the pump, filter, and prior to heat pump). It can be installed prior to the cell
housing (or after if needed).
STEP 5
Cut and connect a length of clear flexible PVC tube that will reach from the outlet at the base
of the peristaltic pump (right side) to the injection valve, that is mounted in the CLEAR faucet
tee, using the tube nut to secure the tube.
STEP 6
Do not cut the other length of clear flexible PVC tube yet. Place the acid drum (with the
required mix) in the required position, in a ventilated area, preferably not near this or other
pool equipment (at least 2m or more away), as the acid is corrosive and equipment damage
will occur.
The system uses a 1 : 3 Acid : Water mix ratio (e.g. with a 20 litre drum add 15 litres water then 5 litres
acid). It is important to use this mix for the correct acid volume to be added.
Important Safety Instruction:
When mixing acid with water,
ALWAYS ADD ACID TO WATER. NEVER
ADD WATER TO ACID
. Always wear the appropriate safety equipment specified by the acid supplier
when handling acid.
STEP 7
Pass this clear flexible PVC tube through the drum label and a 6.0mm hole in the acid drum
vent cap. Connect the clear flexible PVC tube to the suction valve that is mounted to the drum
weight, using the tube nut to secure the tube. Before placing the tubing into the drum,
measure the tubing against the outside of the drum and measure the feed tubing so that there
is sufficient tubing. Lower the drum weight into the acid drum and screw on the drum cap.
STEP 8
Connect the pH Signal Cable with 5 Pin Plug to the Oasis CX Premium Salt & Mineral
Chlorinator programming cable port. This is where the signal from the chlorinator comes from
to turn the pH controller ON & OFF.
STEP 9
Connect the piggy-back power cord to the AC socket outlet of the Oasis CX Premium Salt &
Mineral Chlorinator and the pool pump plugs in to the other end of the piggy-back socket.
STEP 10
Start up your pool pump and check the system for any leaks. Repair any such issues.
STEP 11
Prime the acid feed lines and finalise run settings using the menus below.
Summary of Contents for CX Logix
Page 1: ......