Operating Instruction and Documentation
UNI-LIFT 5000 CLT / Plus
- 32 -
An even installation place has to be provided. The foundations must be based in a
frost resistance depth, both outside and indoors, where you must reckon with frost.
• An electrical supply 3~/N+PE, 400 V, 50 Hz has to be provided. The supply line
must be protected with T16A (VDE0100 German regulation). The minimum
diameter amounts to 2,5 mm².
• All cable ducts have to be equipped with protective coverings to prevent accidents.
9.3 Erection and doweling of the lift
1. Take carefully out the lift of the wood-crate.
Do not pull apart the scissors of the lift !
2. Install the lift according to the data sheet and the foundation plan.
3. Remove the cover of the operating unit.
4. Install the operating unit according to the datasheet and connect the power supply.
5. Connect the hydraulic hoses and the wires of the measuring system with the
aggregate.
The hoses and wires should not cross each other
6. Fill in the hydraulic oil (approx. 40 litres)
6.
Press shortly the button „lifting“. Observe the direction of rotation of the motor.
7.
If no platform raises, check again the direction of rotation of the motor and change
two phases of the power supply if it is necessary (attention: only by 3 phase
supply).
9. Press the button „lifting“ until the lift is on a height of approx. 10 cm.
10.Press the button „lowering“ until both platforms are in the lowest position and the
acoustic signal cannot be heard anymore.
11.Repeat the steps 7 to 10 until the lift surely is in the lowest position.
12.Press the button „lifting“ until the lift is standing on a height of approx. 30 cm.
(above the CE-Stop)
13.Press the button „lowering“ until the lift stops at the CE-Stop. Let the button off.
14.Press the button „lowering“ until both platforms are in the lowest position and the
acoustic signal cannot be heard anymore.
15. Repeat the steps 12 till 14.
16.Press the button „lifting“ until the lift reaches the highest position.
17. Press the button „lowering“ until the lift is in the lowest position.
18. Press the button „lifting“ again until the lift reaches the highest position.
19. The lift was adjusted by these individual steps to its normal function.
20.Adjust the lift: first one base plate, than the second base plate. If there is an uneven
floor even it with metal sheets. A continuous contact between the floor and the base
plate must be guaranteed to avoid hollow spaces.
21. Dowel the lift:
Nussbaum Company demands LIEBIG safety dowels (german
dowel manufacturer) or equivalent dowels of other manufacturer but: observe
their regulations.
Before doweling check the concrete floor (with quality B25!) if the concrete floor
Summary of Contents for UNI-LIFT 5000 CLT PLUS
Page 9: ...Operating Instruction and Documentation UNI LIFT 5000 CLT Plus 9 page for notice...
Page 12: ...Operating Instruction and Documentation UNI LIFT 5000 CLT Plus 12 3 3 Datasheet...
Page 13: ...Operating Instruction and Documentation UNI LIFT 5000 CLT Plus 13...
Page 14: ...Operating Instruction and Documentation UNI LIFT 5000 CLT Plus 14...
Page 15: ...Operating Instruction and Documentation UNI LIFT 5000 CLT Plus 15...
Page 16: ...Operating Instruction and Documentation UNI LIFT 5000 CLT Plus 16...
Page 17: ...Operating Instruction and Documentation UNI LIFT 5000 CLT Plus 17...
Page 18: ...Operating Instruction and Documentation UNI LIFT 5000 CLT Plus 18...