OPI-POWER LIFT HF 3S 12000-V1.0-EN
3
1
General informations .......................................5
1.1 Lift purpose ................................................................ 5
1.2 Liability ........................................................................ 5
1.3 Owner/Employer responsibilities ............................. 5
1.4 Lift operator responsibilities ...................................... 6
1.5 Safety regulations ..................................................... 6
1.6 Safety devices ........................................................... 7
1.7 Safety labels affixed to lift
........................................ 8
1.8 Protocols .................................................................... 9
1.9 Set up and test the lift .............................................. 9
Set up protocol .................................................................. 10
Transfer protocol ............................................................... 11
2
System master sheet ......................................12
2.1 Manufacturer .......................................................... 12
2.2 Purpose .................................................................... 12
2.3 Changes to the design / construction ................. 12
2.4 Changing the assembly location ......................... 12
3
Technical information ....................................13
3.1 Technical data ....................................................... 13
3.2 Sicherheitseinrichtungen ........................................ 13
3.3 Data sheet .............................................................. 14
3.4 Hydraulic plan ......................................................... 16
3.5 Hydraulic connection plan .................................... 17
3.6 Electrical circuit diagram ....................................... 18
4 Installation .......................................................24
5
Operating manual ..........................................24
5.1 Positioning the vehicle ........................................... 25
5.2 Lifting the vehicle .................................................... 25
5.3 Lift synchronization .................................................. 25
5.4 Lowering the vehicle .............................................. 26
6
Behaviour in cases of error ............................26
6.1 Emergency discharge ............................................ 26
6.2 Moving onto an obstacle ...................................... 27
7
Maintenance and care of the system ..........28
7.1 System maintenance plan .................................... 29
7.2 Cleaning and care of the lift ................................. 34
8
Assembly and commissioning ......................34
8.1 Set up guidelines ..................................................... 34
8.2 Lifting arm assembly ............................................... 37
8.3 Lifting arm alignment .............................................. 37
8.4 Commissioning ........................................................ 38
8.5 Changing the assembly location ......................... 38
8.6 Selection of anchors ............................................... 39
9
Safety inspection ............................................40
9.1 Single safety inspection before commissioning .. 41
9.2 Regular safety inspection and maintenance ..... 42
Spare parts list
53
Summary of Contents for HF 3S 12000
Page 2: ...2 OPI POWER LIFT HF 3S 12000 V1 0 EN ...
Page 4: ......
Page 19: ...OPI POWER LIFT HF 3S 12000 V1 0 EN 19 ...
Page 20: ...20 OPI POWER LIFT HF 3S 12000 V1 0 EN ...
Page 21: ...OPI POWER LIFT HF 3S 12000 V1 0 EN 21 ...
Page 22: ...22 OPI POWER LIFT HF 3S 12000 V1 0 EN ...
Page 53: ...Made in Germany POWER LIFT HF 3S 12000 Made in Germany Spare parts list ...
Page 60: ...60 OPI POWER LIFT HF 3S 12000 V1 0 EN 60 xx Switch box 000STA03600 2 05 07 19 ...