OPI-POWER LIFT HF 3S 12000-V1.0-EN
29
7.1 System maintenance plan
i
Before beginning service, disconnect from power. The system is to be secured against unintentional
lowering and unauthorized access.
During assembly and maintenance always check the condition of electrical lines. All cables and lines
must be secured so they cannot be crushed, kinked or contact any moving assembly.
Visual in-
spection
Spray
Oil
Lubricate
Clean with
compressed
air
Clean
Inspect
A
B
H
G
F
E
D
C
D
Summary of Contents for HF 3S 12000
Page 2: ...2 OPI POWER LIFT HF 3S 12000 V1 0 EN ...
Page 4: ......
Page 19: ...OPI POWER LIFT HF 3S 12000 V1 0 EN 19 ...
Page 20: ...20 OPI POWER LIFT HF 3S 12000 V1 0 EN ...
Page 21: ...OPI POWER LIFT HF 3S 12000 V1 0 EN 21 ...
Page 22: ...22 OPI POWER LIFT HF 3S 12000 V1 0 EN ...
Page 53: ...Made in Germany POWER LIFT HF 3S 12000 Made in Germany Spare parts list ...
Page 60: ...60 OPI POWER LIFT HF 3S 12000 V1 0 EN 60 xx Switch box 000STA03600 2 05 07 19 ...