Operating Instruction and Documentation
2.30 SPL
- 26 -
pic 6: choice of the dowel lenght without floor pavement or tile surface
Liebig-dowels
Dowel
type
B20/75 B20/100
Drilling
depth a 115 140
min.
Anchorage
depth
b 85
85
Thickness of concrete
c
see the foundation diagram
Diameter
of
bore d 20
20
Thickness
of
lift-pieces e 0-40
40-65
Number
of
dowels
12
12
Starting torque
according to dowel manufacturer
Nußbaum Company demands LIEBIG safety dowels (german dowel manufacturer)
or equivalent dowels of other manufacturer but observe the regulations.
Summary of Contents for 2.30 SPL
Page 9: ...Operating Instruction and Documentation 2 30 SPL 9 Page for notice...
Page 11: ...Operating Instruction and Documentation 2 30 SPL 11 3 3 Data sheet...
Page 12: ...Operating Instruction and Documentation 2 30 SPL 12 3 4 Electrical diagram drawing...
Page 39: ...Operating Instruction and Documentation 2 30 SPL 39...
Page 40: ...Operating Instruction and Documentation 2 30 SPL 40...
Page 41: ...Operating Instruction and Documentation 2 30 SPL 41...
Page 42: ...Operating Instruction and Documentation 2 30 SPL 42...