9.5 Changing the installation place
If the place of installation shall be changed, the new place has to be prepared in according to
the regulations of the first installation. The changing should be performed in accordance with
the following points:
• Remove the safety sheet and the circlips of the bolts. Remove the carrying arms.
• Lower the lift to its lowest position.
• Switch off the main switch and lock it.
• Loose and remove the plug of the power supply.
• Remove the cover of the tank.
• Remove the oil from tank..
• Loose the equalization ropes at the top of the cross beam.
• Loose pressure and leakage pipe.
• Loose and remove the crossbeam.
• Loosen the dowels at the base plate.
• Transport the automotive-lift to its new location.
• Install the lift in accordance with chapter 9 “ Installation and Initiation”.
Use new dowels, the used dowels can not be used anymore.
A security check must be performed before reinitiation by a competent person. Use
form “Regular security check”.
Summary of Contents for 2.30 SPL
Page 9: ...Operating Instruction and Documentation 2 30 SPL 9 Page for notice...
Page 11: ...Operating Instruction and Documentation 2 30 SPL 11 3 3 Data sheet...
Page 12: ...Operating Instruction and Documentation 2 30 SPL 12 3 4 Electrical diagram drawing...
Page 39: ...Operating Instruction and Documentation 2 30 SPL 39...
Page 40: ...Operating Instruction and Documentation 2 30 SPL 40...
Page 41: ...Operating Instruction and Documentation 2 30 SPL 41...
Page 42: ...Operating Instruction and Documentation 2 30 SPL 42...