Fig. 14
Fig. 15
Fig. 16
Fig. 17
37
COMPACT
EN
5.
ADJUSTMENTS
TO BE MADE BY
A QUALIFIED
TECHNICIAN ONLY
5.1
FILLING
BOILER
MANUALLY
CAUTION
The adjustments listed here below must ONLY
be performed by a Specialist Technical Engineer.
Nuova Simonelli cannot be held liable for any
damage to persons or property arising from fail-
ure to observe the safety instructions supplied in
this manual.
Before performing any operation, the specialist
technical engineer must first switch off the main
switch off and unplug the machine.
CAUTION
ELECTRIC SHOCK HAZARD
All models
are equipped with a level
gauge to keep the water level inside the boiler
constant.
When using the machine for the first time, it is advis-
able to fill the boiler by hand to avoid damaging
the electrical resistor and turning on the electronic
protection.
If this should happen, just turn the machine off
and then start it up again to complete its loading
procedure (see chapter “MACHINE FUNCTIONS
MESSAGE – LEVEL ERROR”).
To fill the boiler manually for the first time, proceed
as follows:
• remove the worktop grid;
• remove the sheet metal guard by unscrewing the
four screws at the sides (A), as illustrated in the
following figure;
• use the manual level valve to allow water to enter
the boiler tank for about 20-30 secs.;
1
2
1
: Operating position
2
: Manual filling position
When the adjustments have been made, refit the
sheet metal guard into its housing and fix it into
place with the four side screws; refit the grid into the
work surface.
5.2
SETTING THE BOILER
TANK PRESSURE (Pressure
switch adjustment)
To adjust the service pressure of the boiler, thus regu-
lating the water temperature, according to the various
functions and needs of the coffee desired, proceed
as follows:
• unscrew the 4 screws on the top panel (Fig. 17);
A