
36
+GH+I:/J:KN/QS+QQS/<+TSUJ/U:
:HUQTS/V@@NYUJY>
!
!
& " ! ` " `#
all meter lights are illuminated (Fig 46).
As the machine is used and the batteries are discharged, the meter lights will go out from
right to left.
If the battery-charge level is allowed to discharge to the point that only the red light remains
illuminated, the operator must consider charging the machine.
If the battery-charge level is allowed to discharge to the point that only one red light remains
! `~`" # !" `" ``
the operator should drive the machine straight to a suitable charge point.
The large capacity gel batteries are sealed for life and are totally maintenance free.
The on-board charger automatically monitors the charging process and will switch off
when the batteries are fully charged.
Insert the charging lead required for your country (Fig 47 for UK, Fig 48 for Europe) into the
charging point.
The machine charging point is located to the rear of the machine under the control panel.
(Fig 49).
Connect to a suitable power supply (Fig 50).
Once mains power is connected the red charging indicator will illuminate.
To ensure a full charge, the machine should be left for a period of 8-12hrs.
Once fully charged, disconnect the charging lead from both the power supply and
the machine (Fig 51).
Fig 47
Fig 46
Fig 49
Fig 50
Fig 51
Fig 48
Machine Charging