background image

  

 

 

 
 

 
 

THE HOTBOX H.E. 

 

Heater Suitable For Natural Gas at Inlet Pressure 20mbar  

or Propane at Inlet Pressure 37mbar  

 

 
 

USE, INSTALLATION & SERVICING INSTRUCTIONS 

 
 
 

ALL INSTRUCTIONS MUST BE LEFT WITH THE USER FOR 

SAFE KEEPING 

 

 

 
 

 

MANUFACTURED by: 

Nu-Flame Limited 

Unit 4, Kimpton Trade & Business Centre 

Minden Road, Sutton, Surrey SM3 9PF 

Tel: 020 8254 6802 

Fax: 020 8641 9992 

Email: [email protected] 

 

Country of Destination - GB & IE

 

 

Revision 16.6.16 RF

 

Summary of Contents for THE HOTBOX H.E.

Page 1: ...INSTALLATION SERVICING INSTRUCTIONS ALL INSTRUCTIONS MUST BE LEFT WITH THE USER FOR SAFE KEEPING MANUFACTURED by Nu Flame Limited Unit 4 Kimpton Trade Business Centre Minden Road Sutton Surrey SM3 9PF...

Page 2: ...of Infrared Control System 26 Guarantee 27 BOX CONTENTS The Fire comes in 1 box containing the Fire with chosen Control and Fitting kit see next page for fitting kit contents plus the chosen Fuel Bed...

Page 3: ...gs 1 Flue Restrictor 2 No 8 x 10mm pointed self tapping screws for the restrictor 4 Magnets for holding Front Trim on 1 2 050mm length of 6mm x 4mm self adhesive silicone sealing strip 1 10mm Back Nut...

Page 4: ...if the oxygen level in the room is depleted due to lack of primary air or obstructed flue blocked chimney that would lead to incomplete combustion of the gas It must not be tampered with and only rep...

Page 5: ...rim Push Buttons Press the lowest button to gradually reduce the gas flow from Maximum to the Pre Set Minimum Setting you will hear the motor turning the control Keeping the Lower Button depressed wil...

Page 6: ...replacement is recommended at the beginning of each heating season or when an acoustic error message sounds during ignition b Error Message Long signals 0 8 second tone 0 2 second break during igniti...

Page 7: ...use abrasive cleaners For Stainless Steel finishes we recommend a small amount of Baby Oil 4 SERVICING a The fire should be Serviced Annually in accordance with the Gas Safety Uses Regulations b This...

Page 8: ...THE INSTALLATION READ THESE INSTRUCTIONS CAREFULLY THESE INSTRUCTIONS SHOULD BE LEFT WITH THE USER FOR SAFE KEEPING AND FUTURE SERVICING PRIOR TO INSTALLATION ENSURE THAT THE GAS TYPE AND PRESSURE ARE...

Page 9: ...he chimney flue is continuous from inlet to termination l Ensure that the chimney flue is structurally sound so that combustion products do NOT come into contact with combustible materials outside the...

Page 10: ...antee Therefore it is important that all gas pipes must be purged of both air and debris i If you suspect that there may still be dirt and or debris in the gas system fit a filter in the pipeline befo...

Page 11: ...to thoroughly dry out before Installation IMPORTANT NOTE Dry lined walls ensure that any air gaps between the back of the plasterboard and wall are sealed around the builders opening or fireplace as t...

Page 12: ...T FLUE FIREPLACES AND THE FOLLOWING DETERMINES THE MINIMUM REQUIREMENTS AND THE ADDITIONAL BUILDING WORK REQUIRED 13 INSTALLATION INTO A PRE CAST FLUE Rebated Fire Surround Rated 150 C or Purpose Buil...

Page 13: ...The Surround must cater for a minimum flat surface around the Fireplace Opening allowing 625mm high by 530mm wide This is essential in order to achieve a good seal between the face of the surround an...

Page 14: ...gh the Property g The Flue Box must be Insulated on its top and sides with 50mm thick Non Combustible Fibreglass Insulation or Equivalent h If plaster board is used in front of the flue box it must be...

Page 15: ...uld be a maximum of 75mm as anything deeper will reduce convection air and the efficiency of the fire For deeper non combustible shelves they must be raised a further 25mm for every extra 25mm of dept...

Page 16: ...LL APPLICATION USING MARBLE SLATE OR STONE SLIPS SHELF IMPORTANT NOTE Dry lined walls ensure that any air gaps between the back of the plasterboard and wall are sealed around the builders opening or f...

Page 17: ...is very important that a good seal is achieved between the back of the Fire s outer frame and the front of the fireplace back panel for safety reasons and to achieve maximum efficiency Take the self...

Page 18: ...fixing is not sound the Rawlplug Eyebolt will be pulled out and the fire will not be sealed to the Fireplace Opening Note With the minimum depth fireplace enclosure it may be necessary to sink the Ey...

Page 19: ...may notice small white marks on the Matrix This is part of the production process TIP When fitting the Coals Pebbles leave gaps between as this helps achieve the best effect TIP Pebbles only The Long...

Page 20: ...oals on top of the 3 large Rear Coals Note The centre coal to be edge on and pushed up against the fireback to make it the highest coal For Pebbles Layout Choosing different colours and textures fit 3...

Page 21: ...t 1 either side of the Large Coal on top of the Triangular Coals and sit the remainder 2 either side and behind the Small C Coals just placed For Pebble Layout Fit 6 Small Pebbles Fit 1 either side of...

Page 22: ...ow to warm up for 5 minutes and then using a lit smoke match joss stick or similar place centrally just under the inner canopy as shown below The majority of the smoke must be drawn under the Fire Can...

Page 23: ...for Servicing b Check the operation and ignition of the fire before servicing c Ensure the fire is cold before proceeding d Lay a dust sheet on the floor before proceeding e Carry out a gas soundness...

Page 24: ...locking the flame to the thermocouple b Check the thermocouple is tightly connected to the control c Change the pilot assembly as a new thermocouple may be required d With the Manual System or 2 Butto...

Page 25: ...stablish how long the fire stays alight then repeat the Spillage Test around this time d For the Thermatronic System check that the Control is functioning correctly as detailed in Section 21 2 specifi...

Page 26: ...26 22 DIAGRAM OF INFRARED CONTROL SYSTEM...

Page 27: ...ry to us We will not be liable for any such breakages or losses Under no circumstances should any attempt be made to repair the burner on site without our express knowledge and approval during the war...

Reviews: