
20
d. For Coals Layout
Fit 2 Large Coals at the Centre-Rear of the Fire.
For Pebbles Layout
Choosing different colours and textures fit
2 Large Pebbles at the Centre-Rear of the Fire.
e.
For Coals Layout
Fit 2 Small ‘C’ Coals, 1 to the far left
and 1 to the far right of those fitted in
d
.
For Pebbles Layout
Fit 2 Small Pebbles, 1 to the far left
and 1 to the far right of those fitted in
d
f.
For Coals Layout
Fit 3 further Large Coals on top of the
3 large Rear Coals.
Note:
The centre coal to be edge on and pushed
up against the fireback to make it the highest
coal .
For Pebbles Layout
Choosing different colours and textures fit
3 further Large Pebbles on top of the 3 Large
Rear Pebbles.
g. For Coals Layout
Fit 2 further Large Coals on top of the
2 Large Coals.
For Pebbles Layout
Choosing different colours and textures fit
2 further Large Pebbles on top of the 2 Large
Pebbles.
h. For Coals Layout
Fit 2 Triangular Coals in the Front Left
and Right Corners of the Matrix.
For Pebbles Layout
Fit 2 Long Pebbles No.3 & No.7 in the Front Left
and Right Corners.