NPK
- 20 -
LUBRICATION
AUTOLUBE GREASE LINE PRE-FILLING
8. Pump grease through the grease line
(
29
) until a steady stream of grease (
28
)
is realized at the opposite (hammer) end.
9. Re-attach the grease line (
29
) to the
hammer (KK).
10. Pump twenty more shots of grease into
the grease line (
29
). This will prime the
hammer cavity and pre-lube the tool.
Look for grease coming out around the
tool (HH) at the tool bushing (see
arrow).
11. Remove the hose fill adapter (a13) and
re-connect the grease line (
29
) to the
Autolube pump (FZ).
NOTE: If the Autolube has run out of grease, the above procedure should be
used to purge all the air out of the line before using the hammer. Failure
to do this will result in an intermittent supply of grease to the hammer.
Summary of Contents for GH10
Page 66: ...NPK 65 WARRANTY STATEMENTS ...
Page 67: ...NPK 66 WARRANTY STATEMENTS ...
Page 68: ...NPK 67 WARRANTY STATEMENTS ...
Page 69: ...NPK 68 WARRANTY STATEMENTS ...