NPK
- 35 -
WEEKLY INSPECTION
1. WELDS
Check for cracks, repair as necessary.
Consult your authorized NPK Dealer or
NPK Service Department for additional information.
2. TOOL RETAINING PIN
Remove the retaining pin and inspect for peening caused by excessive blank
hammering. If necessary, grind edges smooth as shown in TOOL RETAINING PIN
INSPECTION section. The retaining pin must rotate freely.
3. DEMOLITION TOOL
Remove the demolition tool and inspect for peening caused by excessive blank
hammering. If necessary, grind edges smooth as shown in TOOL INSPECTION
section.
4. GAS CHARGE
Check and adjust, if required, see GAS CHARGE section.
Summary of Contents for GH10
Page 66: ...NPK 65 WARRANTY STATEMENTS ...
Page 67: ...NPK 66 WARRANTY STATEMENTS ...
Page 68: ...NPK 67 WARRANTY STATEMENTS ...
Page 69: ...NPK 68 WARRANTY STATEMENTS ...