NPK
- 62 -
GAS CHARGE
DISCHARGING THE GAS PRESSURE
PROCEDURE
1.
Remove the charge
valve cap (M1) from the
charge valve (M).
Do
not remove the charge
valve assembly!
2. Turn the NPK charge
adapter T-handle (g2) to
a full counterclockwise
position.
3.
Install the NPK charge
adapter (g1) onto the
hammer charge valve
located on the hammer
gas head (L).
REMOVE
THE
VALVE
CAP
ONLY,
NOT
THE
CHARGE
VALVE
ASSEMBLY!
4. Tighten the charge
adapter cap (g6).
5. Turn the T-handle (g2)
clockwise. As the T-
handle is screwed in, a
resistance is
encountered. By turning
the T-handle, the
nitrogen gas pressure
will be indicated on the
pressure gauge (g8).
Stop turning the T-
handle when the gauge
reads pressure.
Do not
overtighten!
6.
Loosen the charge adapter
cap (g6)
VERY SLOWLY!
The gas pressure will
gradually decrease to zero.
When it gets to zero, remove
the cap.
7. Remove the charge adapter (g1) from the gas charge valve on the hammer gas head
(L), then, reinstall the charge valve cap.
Summary of Contents for GH10
Page 66: ...NPK 65 WARRANTY STATEMENTS ...
Page 67: ...NPK 66 WARRANTY STATEMENTS ...
Page 68: ...NPK 67 WARRANTY STATEMENTS ...
Page 69: ...NPK 68 WARRANTY STATEMENTS ...