
Service as Required
RG19661,00003FF -19-02MAR13-1/1
Remove And Install Sea Water Pump (4045AFM85/6068AFM85)
1. Close sea cock and drain sea water system.
2. Remove sea water outlet connection (A), remove sea
water pump cap screws (B) and remove pump.
3. Clean all gasket material from both mating surfaces.
4. Inspect gear teeth for damage. Install new gear (D) by
aligning key (C) to the pump shaft keyway.
5. Install lock washer (E) and hex nut (F) finger-tight and
insure key is properly in place.
6. Tighten hex nut to 68 N·m (50 lb.-ft.).
7. Install sea water pump with new gasket to front plate
and tighten cap screws (B) to 140 N·m (103 lb.-ft.).
8. Connect sea water inlet and outlet.
9. Open sea cock, start engine and check for leaks.
A—Sea Water Outlet
B—Cap Screws
C—Key
D—Gear
E—Lock Wasker
F— Hex Nut
RG22172
—UN—10DEC12
Remove and Install Sea Water Pump
RG22173
—UN—10DEC12
Sea Water Pump Drive Gear
OM-C3 | 12/6 | 71
Summary of Contents for M65C13
Page 11: ...Notes OM C3 12 6 9...
Page 121: ......