Scenario: A standard intersection with left turn and through signals on the North-South bound
movements. West-East bound sees heavier traf
fi
c volumes during the weekdays from 6:00AM to 9:00AM
and from 4:20PM to 7:10PM. There are vehicle detectors on the WEST- EAST bound approaches.
1. Choose the Plan to edit (1-10).
2. Set Phase 1 to NORTH-WEST to create a left turn phase for
the North bound movement. Assign unit Primary: Head B,
R-Y-G.
3. Set Phase 2 to SOUTH and assign Secondary 1: Head A,
R-Y-G.
4. Assign Barrier A to Phase 2 (automatically applies the barrier
to Phase 6 as well).
5. Set Phase 3 to WEST and assign Secondary 2: Head A and
Head B, both as R-Y-G. Assign actuation Sensor 32 as POS+.
6. Assign Barrier B to Phase 3 (automatically applies the barrier
to Phase 7 as well).
7. Set Phase 5 to SOUTH-EAST and assign it to Secondary 1: Head B, R-Y-G.
8. Set Phase 6 to NORTH and assign it to Primary: Head A, R-Y-G.
9. Set Phase 7 to EAST and assign it to Secondary 3: Head A and Head B, both as R-Y-G. Assign actuation
Sensor 32 as POS+.
10. Create a DAY OF THE WEEK tab for both the weekend (SAT-SUN) and weekdays (MON-FRI).
SECONDARY 3
SECONDARY 1
PRIMARY
SECONDARY 2
N
S
through the plans. Locate the required plan. To
edit or change a plan, refer to sections 8.3 and
8.4.
On the opposite side of the screen, cycle through
the ACTIVE PLAN NUMBER to select the plan to
be operated.
Navigate back to the home screen. When all
required Secondary Units are connected, press
START PROGRAM. When the program has
started, use the arrows to navigate to the PHZ tab
at the bottom of the HOME screen. Press ENTER
to view the PHASE STATUS screen.
FEB/01/17 09:53AM
PROGRAM: MODEL V##
HOME >
PHZ STATUS
BATTERY:
24.0 VOLTS
UNIT:
PRIMARY
RADIO CHANNEL:
03
RADIO SIGNAL:
STARTED
OPERATING FINE
PRI
SEC1
PHZ
PHASE STATUS
PLAN
1
1
CURRENT PHASE
1
5
TIME
12
12
NEXT PHASE
2
6
PHASES IN QUEUE
3,4
7,8
RING 1
RING 2
SEC2
SEC3
Within the PHASE STATUS SCREEN the following
information can be viewed:
• PLAN - The plan being run.
• CURRENT PHASE (Per associated Ring)
• TIME - Timing for current phase.
• NEXT PHASE - Next phase(s) to be served.
• PHASES IN QUEUE - Phases that are in the
plan, or phases that are actuated and are
awaiting service.
In addition to the phase status screen, cycling
through the PRI and SEC# tabs will provide
machine speci
fi
c diagnostic information.