Nortec AF-22
52002_A_EN_1611
11
9.84 - 13.0 ft. (3.00 – 3.97 m)
These assembly instructions only refer to individual systems. The manufacturer provides individual
system diagrams for the customers' systems
It is obligatory to comply with the material specifications
5.3.1
Standard Mounting
Figure 5: AF-22 wall mounting
Positioning of the atomizers
Select a distance to the ceiling of at least 1.64 ft.
Do not place the atomizers directly above a workplace
The air space has to be free over a distance of 9.84 ft. - 13.0 ft. in an angle of 90°
Avoid exposure of the atomizers to direct sunlight
Connection of the wall bracket
All AF-22 devices are connected with the quick assembly kit delivered as accessory.
The connection for treated water is made using the black PU-4 tube (create branch line to the wall bracket using the
enclosed T connectors).
The compressed air tube is connected using the blue PU-9 tube (create branch line to the wall bracket using
the enclosed T connectors).
The power supply from the transformer is connected via junction boxes in the form of a branch line to the
relevant wall bracket. On the junction box, it is run through the cable duct of the wall bracket and connected to
the enclosed plugs. The length of the cables has to correspond to the length of the tubes.
8.20 ft. (2.50 m)
Min. 1.64 ft. (0.50 m)