![Nordica LNK15 User Manual Download Page 52](http://html.mh-extra.com/html/nordica/lnk15/lnk15_user-manual_1701826052.webp)
VSP
VST
95 °C
T
TS
CA
R
VMS
VM
VE
M
1
2
3
12
13
14
15
11
6
6
7
8
9
10
16
5
4
ENGLISH
CLOSED VESSEL INSTALLATION.
THE DIAGRAMS ARE PURELY INDICATIVE, THEREFORE THEY DO NOT HAVE DESIGN VALUE
.
INSTALLATION, RELATIVE SYSTEM CONNECTIONS, COMMISSIONING AND VERIFICATION OF CORRECT OPERATION MUST BE CARRIED OUT
CORRECTLY BY PROFESSIONALLY QUALIFIED AND TRAINED PERSONNEL IN FULL COMPLIANCE WITH CURRENT NATIONAL, REGIONAL,
PROVINCIAL AND MUNICIPALITY REGULATIONS IN THE COUNTRY WHERE THE APPLIANCE IS INSTALLED.
Size the system correctly to avoid long pause times that would cause significant problems like the ones mentioned in the section regarding
DOWN-FIRED BOILER OPERATION.
ATTENTION
: THE BOILER’S CIRCULATOR OPERATES BASED ON THE DIFFERENTIAL TEMPERATURE BETWEEN THE BOILER AND
THE PUFFER. IF THE BOILER’S TEMPERATURE DROPS BELOW THE TEMPERATURE OF THE PUFFER, THE CIRCULATOR STOPS.
1
LNK DOWN-FIRED BOILER
2
AUTOMATIC
DSA THERMAL DISCHARGE
VALVE
3
SAFETY VALVE
2,5 bar
4
THERMOMETER
5
PRESSURE GAUGE
6
EXPANSION TANK
VEC
7
CIRCULATOR
8
ANTI-CONDENSATION MIXING VALVE FOR 60°C RECIRCULATION CIRCUIT
(can be supplied as an
OPTIONAL
accessory)
9
BALANCING VALVE
10
PUFFER
11
SOLAR PANELS
12
DOMESTIC HOT WATER PRODUCTION
13
AUXILIARY BOILER (GAS, METHANE, LPG or DIESEL)
14
RADIATOR SYSTEM (high temperature)
15
RADIANT PANEL SYSTEM (low temperature)
16 (*)
PUFFER PROBE
(*) IMPORTANT: THE BUFFER TANK PROBE POSITION IS ILLUSTRATIVE. THE REAL POSITION HAS TO BE EVALUATED WITH THE INSTALLER/
DESIGNER.
52