20
Figure 16: Valve Module Bracket Installation
5.
Connect one of the valve module CANbus connectors to the existing cable labeled
“NORAC” running to the rear of the sprayer from the electrical box. Route cable C03
from the other CANbus connector to the 8-way coupler (E11).
6.
With the valve module securely mounted to the valve block, connect the valve cables (C10),
to the valve coils. Insert the 2-pin plugs (P01) into the unused 2-pin connectors on the
valve module.
7.
Connect the temperature probe to the valve block using the supplied 3/8” x 1/2” hex bolt.
Figure 17: Valve Module - Valve Coil Connections
Right Tilt Ports
Tank Port
Pressure Port
Left Tilt Ports
3
rd
Station Ports