START-S7lT
operating guide
-19-
7.2
Memorization of the working time with a command START
2
1
4
3
6
5
8
7
10
9
1
Take the power supply and put
DIP9
in
ON.
The gate is
CloSed
2
Give power supply to the control unit.
3
Press the
START
button (all which is connected to the terminal
board no.15 or in the 1st channel of the remote control)
The gate is
oPenInG
4
Press
START
to definy when the automation starts slowing
down otherwise read the next passage.
The gate is
SlowInG
down
5A
If the open limit switch is not available, when the gate reach the
stroke, press the START comand.
The gate
SToPS
5B
If the open limit switch is connected, you don’t need to do
nothing as the limit switch boost the programm.
6
let the time goes until the gate is opening.
This is the
automation
“PAUSE TIME”
7
The automation is in PAUSe TIMe
The automation
starts in
CloSInG mode
9
Press
START
when the gate starts to slowing down, otherwise
you need to read the next passage.
The gate is
SlowInG
down
10
wait until the gate stops automatically.
The gate is
CloSed
11
Put in
OFF
the
DIP9
to return in the standard function. The
signal light turned off and led l1 will starts again.
end of the
memorization of
the working time
2
1
4
3
6
5
8
7
10
9
IF yOU DON’T USE AN ENCODER:
Memorize the time with the trimmers (speed)
Summary of Contents for START-S7LT
Page 12: ......
Page 36: ......
Page 92: ...START S7LT Manual T cnico 21...
Page 118: ......
Page 120: ...REC S7 Cavetto per collegamento batteria 12V ricarica e soccorso...