START-S5PV
Technical manual
-10-
2.11 Connection of the OPENING and CLOSING limit switches
You can see both limit switches in the picture but in this control unit you can use separately.
The contact of the limit switches are NORMALLY CLOSED
12 13 14 15 16 17
12 13 14 15
OPEN
CLOSE
If the inputs OLS (opening limit
switch) or OLS ( closing limit
switch) are not used, make a link.
(16-26) (16-27)
2.12 Connection of the control OPENING “START” and “PARTIAL OPENING”
12 13 14 15 16 17 18 19 20 21 22 23 24 25
The connection of openinc control with START
can be done with every button or N.A. contact.
If more devices are available, they should be
parallel connected.
The connection of PARTIAL OPENING can
be done with every button or a NORMALLY
OPEN contact.
You can connect a TIMER to plan the opening
and closing time of the gate, with the terminal
board no.16 and 21. The contact should be
NORMALLY OPEN and it should e closed for
all time the gates is open. If the connection of
the opening is available in the terminal board
no.21, connect it in parallel.
2.13 Check of the connections
Check the correct tension of the terminal board, the right lighting of the red N.C. l.e.d., watch the TEST l.e.d. which should
fl ash each second, the safety function and the correct direction of the gate (the fi rst manoeuvre will be OPEN)
2.10 Connection of STOP devices
15 16 17 18 19 20
The connection of safety devices can be down
with every button or a NC contact.
BUTTON: it stops temporary the control unit until
a new function.
SWITCH: the automation stops until a new reset.
If more devices are available they can be serial
connected.
If the input STOP
is not used make a
link. (16-18)