30
Instructions for transport
TB 151/181/211
Shredders
$
INSTRUCTIONS FOR TRANSPORT
1. Putting the machine into transport
position
From the working position:
- Lift the machine with the tractor's three point linkage.
- Lock hitch frame using lock pin (1) and lynch pin (2).
- Activate offset arm cylinder to place the shredding unit
in line with the tractor.
- Operate shredding unit cylinder to place shredding
unit in horizontal position.
- Fully raise tractor lift linkage.
The machine is in transport position.
Before placing the machine into transport
position:
-
Wait until the rotating parts have come
to a complete stop
.
- Check that nobody is within the machine
pivoting area.
-
If there is someone, make sure the
person moves away
.
The machine is in transport position when:
- The shredding unit is in line with the
tractor.
- Shredding unit in horizontal position.
- The tractor's lift linkage is in raised
position
Never engage the tractor PTO drive when the
machine is in transport position.
2
1
Summary of Contents for TB 151
Page 1: ...OPERATOR S MANUAL SHREDDERS TB 151 181 211 Cod mum TB_G English 04 2006...
Page 2: ......
Page 55: ...Limited warranty 53 TB 151 181 211 Shredders LIMITED WARRANTY...
Page 56: ......
Page 57: ......
Page 58: ......
Page 59: ...Trince Broyeur Mulcher Mulchger t TB DX 02 03 2009...