picture 4  Install reducing pipe or gradually expanding tub to effect pressure loss

(d/D)

4. ) When the pipe diameter is inconsistent with the sensor, the sensor is installed at both ends tapered or 
gradually expanding tube, and then with the pipe connection. Gradually expanding, tapered conical tube 
should be no more than 15 degrees. When using 15 cone angle gradually expanding, tapered tube, the 
pressure loss resulting from the curve in Figure 4 :

d.Sensor internal diameter; D.diameter, V.flow rate of 
sensor(m/s)

5) sensor installation should be taken in the horizontal electrode as horizontal position, once the media containing 
bubbles or sediment, the bubbles will not be adsorbed on the electrode in the vicinity, resulting in conversion of the 
input terminal open circuit; sediment will not cover the electrode, caused by zero drift;
(6) liquid-solid two-phase medium, the vertical installation of a more favorable, a measured medium can prevent 
phase separation, two lining wear sensor allows more uniform. Vertical installation, the medium flow direction 
should be bottom-up, so as to ensure that the sensor tube is always filled with medium.

SENSORS  PARTS

PR

ES

SU

RE

  

LO

SE

(P

a)

06

SENSORS  PARTS

TM

Http: // www.flowmeter.cc

SENSORS

 

Summary of Contents for Flowtech MF710

Page 1: ...ISO9001 2000 NITTO INSTRUMENTS CO LTD TM KF700 Series Electromagnetic Flowmeter OPERATION INSTRUMENTS MF710 MF730...

Page 2: ...rounding 10 The preparation of pre operational 11 Maintenance and common trouble shooting 12 Complete sets of products and Open Box 13 Quality Assurance 14 Transport and storage 15 Order Information 1...

Page 3: ...Description 3 Menu item 4 Commonly used to guide the functional operation for Transimitter 1 Zero Correction 2 Unit of Flow 3Instantaneous flow Resolution 4 Unit of Total 5 Cumulative total flow reso...

Page 4: ...D which in this instance is the distance between the electrodes In the case of wafer style magnetic flowmeters a magnetic field is established throughout the entire cross section of the flow tube Figu...

Page 5: ...of the sensor aperture 8 To install usage and easy maintenance Structure diagram 1 Junction box 2 flange 3 insulated liner 4 electrode 5 measuring tube 6 excitation coil 7 shell Sensor structure show...

Page 6: ...900 1000 1200 1400 90 95 105 115 140 150 165 185 200 220 250 285 340 395 445 505 565 615 670 780 895 1015 1115 1235 1405 1630 60 65 75 85 100 110 125 145 160 180 210 240 295 350 400 460 515 565 620 7...

Page 7: ...0 200 250 300 400 500 600 800 1000 100 120 160 200 250 300 400 500 600 800 1000 1200 1600 160 200 250 300 400 500 600 800 1000 1200 1600 2000 2500 200 250 300 400 500 600 800 1000 1200 1600 2000 2500...

Page 8: ...of instrument installation environment should pay attention to 1 The instrument should be installed at the ventilation to dry avoid installing at the place easy accumulation water 2 The instrument sh...

Page 9: ...s 5 sensor installation should be taken in the horizontal electrode as horizontal position once the media containing bubbles or sediment the bubbles will not be adsorbed on the electrode in the vicini...

Page 10: ...recommend installation In order to enable reliable flow meter Pls note the following installation requirements 1 As far as possible to avoid ferromagnetic objects and equipment with strong magnetic f...

Page 11: ...ing to the earth is zero potential to reduce outside interference Under normal circumstances industrial pipes are metal tubes and grounded in itself which easily meet the requirements but in a larger...

Page 12: ...e factory one by one after passing the test In Plants To the end user So it can be put into operation without any adjustments Therefore the initial operation of the problems encountered should be in a...

Page 13: ...ith reference to Table Check signal line to ground resistance to use a multimeter measuring electrode to ground resistance generally from thousands of OM to some 10k om Electromagnetic flow sensors ge...

Page 14: ...temperature range in 20 C 60 C d do not dry 90 humidity Orders must be measured in accordance with specific targets and measuring conditions of access to the Company on the selection of technical info...

Page 15: ...oric acid with good corrosion resistance is also resistant to sulfuric acid phosphoric acid hydrofluoric acid organic acids and other non oxidizing acids alkalis salt solution of non oxidative corrosi...

Page 16: ...by the thermal radiation Plateau please provide the thermal isolation or ventilation Instrumentation installed in the switch box there should be appropriate measures of net and ventilation are example...

Page 17: ...proved by threading into the instrument cavity see circle After the wiring waterproof joints should be tightened to ensure that moisture and corrosive gases do not enter the electronic part 4 Input an...

Page 18: ...ect the power supply 1 the power cable of inside the sensor will not wound 2 the power input line should separated with other input and output lines threading through the holes into their own dedicate...

Page 19: ...includes the cables used to connect the resistance Current output cable is recommended RWP2x16 015 PVC insulated sheathed cable shield 2 Counter The Transmitter frequency pulse output has been achiev...

Page 20: ...alue or other self assemblies off information If there is no meter to power after the show display without backlight then the power supply and connectivity in identifying ways to meet the requirements...

Page 21: ...l would be no show then please contact the manufacturer TRANSIMITTER 1 Panel construction and key definition 18 CONVERT PARTS TM Http www flowmeter cc CONVERT Instructions Instrument Display Interface...

Page 22: ...1 5 Direction 2 1 6 Indication 3 4 K Character 3 5 Total preset 3 6 1 Actual Zero mV 3 6 2 Empty Freq Hz 3 6 3 Full Freq Hz 3 3 Zero Trim 4 Test 4 1 Loop Test 4 2 Pulse Test 2 menu construction Secon...

Page 23: ...ual Adjust CHK Instrument Test Enter the parameter setting Press C CE bond Appears in Figure interface select C CE will enter the menu Click to quit menu TRANSIMITTER 20 CONVERT PARTS TM Http www flow...

Page 24: ...n a quiescent state Flowmeter be good grounded see page 9 Meter Warm up time of not less than 15 minutes 21 CONVERT PARTS TM CONVERT Http www flowmeter cc 1 2 3 4 5 Click to show confirm menu Steps Op...

Page 25: ...ing rangL S L min L h m3 S m3 m m3 h gal S gal m gal h Steps measurement mode Basic PV Units PV Units L h L h PV Units L h m3 h PV Units L h ENT ESC m3 h 1 2 Steps Operation instructions Interface sho...

Page 26: ...wo times from configuration menu to measurement menu also you can continue other operation Click key to change Unit of Total Click to show confirm menu Click key enter Total Units Total Units L L Tota...

Page 27: ...om configuration menu to measurement menu also you can continue other operation damping S 01 0 Max 99 9 Min 0 1 0 10 damping S 01 0 Max 99 9 Min 0 1 03 0 damping S 01 0 ENT ESC 03 0 3 TotalDecimal 1 E...

Page 28: ...ow m3 h Meter scale flow QMAX range depending on the caliber meter DN unit mm Scale flow units m3 h Omin DN2 3540 the equivalent of the current caliber 0 1m s velocity Qmax DN2 29 5 equivalent diamete...

Page 29: ...Cutoff 1 0 Max 9 9 Min 0 0 2 0 Steps measurement mode system signal Low Cutoff Steps measurement mode system Pulse Output Freq Max Hz 8 Small flow termination low The parameters on the display and out...

Page 30: ...n Freq Max Hz 2000 Max 5000 0 Min 100 0 2000 Freq Max Hz 2000 Max 5000 0 Min 100 0 3000 9 Liter pulse L P Current Flow L s Output Frq Hz Liter pulse L P Liter pulse L P When the Liter pulse 0 0 the ca...

Page 31: ...u to measurement menu also you can continue other operation Steps measurement mode system Total set Clear Total Liter pulse 0 0000 Max Min 0 00555 0 1000 10 Cumulate Clear Two ways of the total cumula...

Page 32: ...Operation instructions Interface show Click key to confirm and return configuration menu click give up modify Click three times from configuration menu to measurement menu also you can continue other...

Page 33: ...99 9s adjusts for Display or output Current output self calibration Empty full Trim Zero Trim Current frequency output self test Excitation loop detection Zero Empty and flow signal detection Measure...

Page 34: ...d full trim is not correct or tube region is high sensitivity settings Zero point value too High on zero trim A on the zero trim time the flowmeter sensor medium in a state of non full pipes B on the...

Page 35: ...show have alarm signal or not Yes Yes Yes No No No Have other display Fuse break Full tube or not No No No Yes Yes To change or reinstall tube to sure tube full medium Some dunghill inhere wall of tu...

Page 36: ...changes in the scope of the conductivity of the liquid does not exceed the scope of permissible 2 Pls don t apply instrument in this situation for conductivity lower than 20 s cm In accordance with t...

Page 37: ...in or contact with company Modify position of flowmeter or change tube to sure full liquid into tube sensor reference Sensor manual Install getter device on upper stream of flowmeter In accordance wit...

Page 38: ...following requirements for indoor a drying ventilation and avoid erosion of corrosive gas b a small mechanical vibration to avoid the impact to flowmeter c Environment temperature range 20 60 C d The...

Page 39: ......

Page 40: ...37 TM...

Page 41: ...r Master 53 m3 Flowmeter 56 m3 K Factor Flowmeter 0 0768385 Flow Master Flow K Factor Flowmeter K Factor 53 56 0 9464285 0 0768385 0 0727221 K Factor Flowmeter Master 53 m3 Flowmeter 56 m3 K Factor Fl...

Reviews: