Air intake
___________________________________
The air intake must not be blocked.
___________________________________
1. Draft stabilizer
2. Hose
3. Spigot
EXHAUST CONNECTION, MODEL ETS 1500
___________________________________
The drying cabinet must not be connected to
a fireplace chimney.
___________________________________
p
Fit the spigot supplied to the hose. Affix
the spigot and hose to the dryer top.
Connect the other end of the hose to the
draft stabilizer
which should then be firmly
attached to the exhaust air valve.
When the drying cabinet is working, 45 m³ of moist air are evacuated per hour. This air is taken
from the room where the dryer is sited. Hence make sure air can enter the room to replace the
moist air leaving.
1. By means of a draft stabilizer
The drying cabinet should be connected to a standard register.
The drying cabinet can be connected to an exhaust duct in two ways: either with a draught inter-
rupter or rigidly connected to an exhaust air ventilation system.
If the drying cabinet is to be connected to an existing ventilation system, a draught interrupter must
always be used, so that the general ventilation in the room is not affected.
Only use a rigid connection when a separate exhaust air duct has been provided for the drying cabinet.
The air flow in the exhaust duct should be adjusted to 45 m³/hour.
The drying cabinet has been tested and set at the factory for connection with a draught interrupter.
Humid air out
INSTALLATION