background image

20

Nieco Corporation - Model MPB73

3-Compartment Sink

Open the side access door.

Slide burners out.

Take to the 3-compartment sink and scrub with a
scrub pad.

If necessary, use a stiff toothbrush to clean any
clogged burner holes.

Repeat steps for all burners.

REASSEMBLY: Be sure the holes on the burner are
facing up.

Burners must be completely dry before reassembly.

Lower Burners -

P/N

16974

(Double);

17622

(Single)

Side

Tools

Instructions

Clean: Weekly

Heat Resistant Gloves

1.

2.

3.

4.

5.

Scrub Pad

!

From the feed end, lift up and pull towards you.

Wash with a scrub pad, rinse, and sanitize in the
3-compartment sink.

REASSEMBLY: Make sure shields are seated
properly on brackets.

Lower Burner Shields -

16988

Feed End

Tools

Instructions

3-Compartment Sink

Scrub Pad

Clean: Weekly

Heat Resistant Gloves

1.

2.

Summary of Contents for MPB73

Page 1: ...store or use gasoline or other flammable vapors or liquids in the vicinity of this or any other appliance APPROVALS IMPORTANT RETAIN THIS MANUAL IN A SAFE PLACE FOR FUTURE REFERENCE Updated 6 3 08 Br...

Page 2: ......

Page 3: ...ements 6 B 5 Clearance 6 B 6 Gas Connection 7 B 7 Flexible Gas Line Installation 7 B 8 Restraining Device 8 B 9 Electrical Connection 8 B 10 Pre Operation Check 8 C Operation 9 C 1 Controls and Indica...

Page 4: ...amage claims are the responsibility of the purchaser and ARE NOT covered under warranty The warranty does not extend to Damages caused in shipment or damage as a result of improper use Installation of...

Page 5: ...has been factory trained and has a complete supply of parts for your Nieco Automatic Broiler You may contact the factory direct at 707 284 7100 if you have trouble locating your local Nieco Distributo...

Page 6: ...ts The Nieco Corporation does not endorse the use of any particular cleaning degreasing agent Use only those chemicals that are approved for use your kitchen The broiler should be grounded according t...

Page 7: ...f adequate size and the following minimum capacity Do not obstruct the flow of combustion and ventilation air An adequate air supply must be available for safe and proper operation For installations i...

Page 8: ...In order to avoid sharp kinks or excessive bends that could have a damaging effect on the connector it may be necessary to attach pipe elbows in order to bring the connector into its proper plane For...

Page 9: ...e of local codes with the National Electrical Code ANSI NFPA 70 or the Canadian Electrical Code CSA C22 2 as applicable Before starting broiler tighten all electrical connections in control box An ele...

Page 10: ...turn to set cook times Load Sensing Control Use to calibrate broiler and set temperature Main On Off Switch Push up to turn on down to turn off On Off Indicator Light Broiler is on when illuminated ON...

Page 11: ...fter the third attempt the ignition failure light will flash and the main on off switch must be cycled to repeat the procedure If this still doesn t light the broiler see the MANUAL IGNITION instructi...

Page 12: ...ol C 3 Shutdown Procedures PLANNED SHUTDOWN 2 Close the MAIN GAS VALVE b Valve is closed when it is perpendicular to pipe EMERGENCY SHUTDOWN 1 Turn off the MAIN POWER SWITCH Your Nieco Automatic Broil...

Page 13: ...ng control This control will detect when your broiler is getting too hot and will lower the gas pressure to help cool the broiler down in the event of a flare up The control is factory set and does no...

Page 14: ...sembly CAUTION Follow the Disassembly and Reassembly steps to ensure proper operation of the broiler Failure to do so may result in operational problems WARNING BROILER PARTS ARE HOT DO NOT ATTEMPT TO...

Page 15: ...crub Pad Towel Heat Resistant Gloves Degreaser Soft Bristle Brush Utility Knife Small Orifice Brush Shaft Cleaning Tool Tools Needed 1 2 This Stop sign shows a step in the procedure that must be follo...

Page 16: ...ad Slide grease pan out Make sure grease pan is cool before putting in water or it may warp the pans Take to sink area and spray with degreaser Wash with a scrub pad rinse and sanitize in the 3 compar...

Page 17: ...warp Discharge Pan Insert P N 17605 Discharge End Tools Instructions Clean Per Shift 3 Compartment Sink Degreaser 1 2 3 4 Green Scrub Pad Dip Tank If Applicable Lift discharge pan up and off slots Tak...

Page 18: ...tions Dishwasher Clean Twice daily 1 2 3 Green Scrub Pad 4 Tilt stripper blade away from chain lift off brackets Make sure stripper blade is cool before putting in water or it may warp Take to sink ar...

Page 19: ...roiler Wipe shaft cleaning tool with a towel Do not run the broiler while cleaning the shafts Clean only the part that is accessible Chain Shafts Discharge End Tools Instructions Clean Daily 1 Shaft C...

Page 20: ...urner are facing up Burners must be completely dry before reassembly Lower Burners P N 16974 Double 17622 Single Side Tools Instructions Clean Weekly Heat Resistant Gloves 1 2 3 4 5 Scrub Pad From the...

Page 21: ...T Be careful not to burn yourself Grasp handle and lift Catalyst off to remove from Shroud SOAK IN WARM WATER FOR 1 HOUR RINSE WITH WATER ONLY NEVER USE ANY CHEMICALS ON THE CATALYST Lay flat to drain...

Page 22: ...ctions Clean Weekly 3 Compartment Sink Scrub Pad Heat Resistant Gloves Degreaser 1 CAUTION Extremely Hot 2 3 Lift each burner up and out of broiler Take to the 3 compartment sink and scrub with a scru...

Page 23: ...23 Nieco Corporation Model MPB73 Clean orifices using a small dry orifice brush Orifices P N 14041 41 Upper and lower Inside Tools Instructions Small Orifice Brush Clean Monthly 1 Burner Orifice...

Page 24: ...reverse buttons located on the side of the control box to help clear a belt jam Check the stripper blade to make sure it is installed properly Feeder belt not moving Make sure the feeder is assembled...

Page 25: ...25 Nieco Corporation Model MPB73 F PARTS LOCATION DRAWINGS Feed End View...

Page 26: ...Discharge End View 26 Nieco Corporation Model MPB73...

Page 27: ...era tion of your broiler G SPECIFICATIONS AUTOMATIC BROILER Model MPB73 DIMENSIONS INCH MM Length 28 50 724 Height 31 33 796 Width 37 21 945 ENERGY GAS MODELS Gas connection 3 4 N P T Electrical conne...

Page 28: ...Nieco Corporation 7950 Cameron Drive Windsor CA 95492 707 284 7100 Office 707 284 7430 Fax www nieco com e mail service nieco com Printed in the USA 2007 Nieco Corporation...

Reviews: