External additional heat
Gaspanna
Olje-/pelletspanna
Solfångare
EP8
RM5
ALT 1
GAS V.
ALT 2
HQ
EB1
EM2
RM5
RM5
On/off
Frånluftsvärmepump
On/off
Vedpanna med ackumulator
CP1
CM5
GP31
GP32
EM1
FL1
GP12
GP12
RM
CP2
Extern styrning
Extern styrning
Solar panels
Wood boiler with accumulator
Gas boiler
Oil/pellet boiler
Solar panels
Accumulator
Wood-fired
boiler
Oil /
pellets
Gas
boiler.
On/Off
Exhaust air heat pump
On/Off
F120
Accumulator
ALT. 2
ALT. 1
External control
External control
Explanation
Pump station, limits low temperat-
ure
GP32
Oil/Pellet boiler
EM2
Expansion vessel
CM5
Particle filter
HQ
Safety valve
FL1
Accumulator tank
CP1
Non-return valve
RM5
Charge pump
GP12
Immersion heater
EB1
Pump station, limits high temperat-
ure
GP31
Wood-fired boiler
EM1
29
NIBE™ SPLIT ACVM 270
For the Installer
Pipe installation
Summary of Contents for ACVM 270
Page 2: ...LEK LEK 1 2 LEK LEK 7 LEK 5 6 LEK 3 4 LEK LEK LEK LEK AMS 10 8 LEK LEK AMS 10 12 ...
Page 67: ...67 NIBE SPLIT ACVM 270 Miscellaneous Electrical circuit diagram ...
Page 68: ...NIBE SPLIT ACVM 270 68 Miscellaneous Electrical circuit diagram ...
Page 69: ...69 NIBE SPLIT ACVM 270 Miscellaneous Electrical circuit diagram ...
Page 70: ...NIBE SPLIT ACVM 270 70 Miscellaneous Electrical circuit diagram ...
Page 94: ......
Page 95: ......