![Newmac CL 115C Installation, Operating And Service Manual Download Page 40](http://html1.mh-extra.com/html/newmac/cl-115c/cl-115c_installation-operating-and-service-manual_1679763040.webp)
40
IMPORTANT INSTRUCTIONS
1. An emergency power switch is required to be installed in a convenient location at a safe distance from the
burner. This switch interrupts the electrical supply circuit to the appliance. Make sure you are aware of its
location and the off position is clearly marked.
2.
Keep the space clear around the appliance within the specified clearances to combustibles.
3. Ensure the supply of combustion air to the appliance is not obstructed or cut-off.
4. Maintain proper ventilation of the appliance area.
5.
Maintain free air flow through the return air registers. *
6. Contact service personnel before remodeling.
7. Contact service personnel for annual service and maintenance.
8.
Contact service personnel for air filter replacement. *
9. Contact service personnel before and after extended periods of appliance in operation.
10.
The burner is fully automatic in operation. All adjustments should be made by a qualified technician. Do not
push the reset button more than once.
CAUTION: do not attempt to start the burner when excess oil has accumulated, when the appliance is full of
vapor, or when the combustion chamber is very hot.
11. CAUTION: do not tamper with the appliance or controls—call your service personnel.
12. Do not use gasoline, crankcase oil, or any oil containing gasoline
13. Always keep the oil supply valve shut off if the burner is shut down for an extended period of time.
14. Do not start the burner unless the blower access door is secured in place.
15. Never burn garbage or paper in the heating system, and never leave paper or rags around the appliance.
* Furnaces only
Summary of Contents for CL 115C
Page 7: ...7 Figure 7 FLUE PIPE CONNECTION MINIMUM INSTALLATION CLEARANCES...
Page 17: ...17 Figure 11 TYPICAL A C COIL INSTALLATION...
Page 18: ...18 Figure 12 WIRING DIAGRAM WITH AIR CONDITIONING...
Page 19: ...19 Figure 13 CL SERIES WIRING DIAGRAM...
Page 23: ...23 Figure 17 1E AERO PGB 220 370 GAS BURNER EXPLODED ASSLY...
Page 25: ...25 Figure 17 1G THERMO DISC MOUNTING ON BURNER PLATE...
Page 26: ...26 Figure 17 2A AERO BURNER EXPLODED ASSEMBLY...
Page 28: ...28 Figure 17 3A BECKETT BURNER EXPLODED ASSEMBLY...
Page 56: ...Figure 17 3A ASSEMBLAGE EXPLOD DU BR LEUR BECKETT...
Page 58: ...FIG 17 2A BR LEUR AERO ASSEMBLAGE CLAT...
Page 59: ...FIG 17 1G LE DISQUE DE THERMO MONTE SUR LA PLAQUE DE BR LEUR...
Page 64: ...FIG 13 C BLAGE DE LA S RIE CL...
Page 74: ...FIG 7 RACCORDEMENT DU TUYAU DE FUM E ET ESPACE LIBRE MINIMAL FIG 8 EMPLACEMENTS DES COMMANDES...