STARTING GAS BURNER
1. Be sure cock on combination valve is in "OFF" position for
5 minutes.
2. Open gas cock on combination valve to "ON" position.
3. Turn to electric switch.
4. Set room thermostat above room temperature.
5. Burner will light.
6. Set room thermostat to temperature desired.
ADAMS GAS BURNER EXPLODED ASSLY - HP225 BPS
Ref DESCRIPTION
HP-225 BPS
1
Top Housing
7582-GN
2
Thermocouple
----------
2
Sensor Probe
12003
3
Pilot Burner
J 124 DDA
4
Pilot Orifice (Nat.)
5221 (.021)
4
Pilot Orifice (Prop.)
3215 (.015)
5
Ignition System
EPI-100 or EPI
6
Transformer (20 V.A.)
AT 20 A
7
Relay
R 8222 A 1002
8
Terminal Block
7586-3
9
Air Door
7582 A
10 Bottom Access Door
7587 B
11 Slide Tray Assembly
7586 D
12 Manifold
7015 D-6
13 Pedestal (Not Shown)
7584
14 Burner Casting
7583-1
15 Insulating Boot
846
16 Pilot Shield
12005
17 Electrode (3“)
7583-5A
18 Combination Valve (Nat.)
SX 242 NS
18 Combination Valve (Prop.)
SX 242 LS
19 Pipe Nipple
50001-6-3 ½
20
Main Orifice (Specify Size)
172
21
Adjustable Orifice Assembly
6481
22 Bottom Housing Assembly
7581 B
23 Mounting Flange (Optional)
7585
24 Motor/Blower Assembly
7586-2A
25 APR Module (Optional)
----------
26 Extension Sleeve (Not Shown) 7581-1A-BL
27 Ignition Wire (30 inch)
7803
28 Sensor Wire (30 inch)
7852-2
Figure 17-1C
Figure 17-1D ADAMS GAS BURNER PARTS LIST
HP225 BPS
Summary of Contents for CL 115C
Page 7: ...7 Figure 7 FLUE PIPE CONNECTION MINIMUM INSTALLATION CLEARANCES...
Page 17: ...17 Figure 11 TYPICAL A C COIL INSTALLATION...
Page 18: ...18 Figure 12 WIRING DIAGRAM WITH AIR CONDITIONING...
Page 19: ...19 Figure 13 CL SERIES WIRING DIAGRAM...
Page 23: ...23 Figure 17 1E AERO PGB 220 370 GAS BURNER EXPLODED ASSLY...
Page 25: ...25 Figure 17 1G THERMO DISC MOUNTING ON BURNER PLATE...
Page 26: ...26 Figure 17 2A AERO BURNER EXPLODED ASSEMBLY...
Page 28: ...28 Figure 17 3A BECKETT BURNER EXPLODED ASSEMBLY...
Page 56: ...Figure 17 3A ASSEMBLAGE EXPLOD DU BR LEUR BECKETT...
Page 58: ...FIG 17 2A BR LEUR AERO ASSEMBLAGE CLAT...
Page 59: ...FIG 17 1G LE DISQUE DE THERMO MONTE SUR LA PLAQUE DE BR LEUR...
Page 64: ...FIG 13 C BLAGE DE LA S RIE CL...
Page 74: ...FIG 7 RACCORDEMENT DU TUYAU DE FUM E ET ESPACE LIBRE MINIMAL FIG 8 EMPLACEMENTS DES COMMANDES...