![Newmac BC 160 Installation, Operating And Service Manual Download Page 40](http://html1.mh-extra.com/html/newmac/bc-160/bc-160_installation-operating-and-service-manual_1679761040.webp)
39
BAFFLE RETAINER AND BAFFLE INSTALLATION
STEP 1: Position first cast baffle in boiler on supports
as shown
STEP 2: Put baffle retainers in place by sliding one
along each edge of the baffle
STEP 3: Once one baffle and baffle supports are in
place slide second cast baffle into place
STEP 4: Inserting stainless steel baffle. Slide baffle
through the firedoor and position so that the short
brake on the steel is closest to the front and pointing
up. Raise the front of the baffle high enough that the
edge can be slid under the cast baffle. Once the
stainless steel baffle is under the edge of the cast
baffle, continue to push the stainless steel baffle until
the bend comes up tight against the front of the cast
baffle. Note the baffles and retainers may have to be
lifted slightly to slide the stainless steel baffle under it
BAFFLE
BAFFLE
RETAINER
FRONT VIEW
TOP VIEW FROM FRONT
Summary of Contents for BC 160
Page 21: ...20 DIAGRAM 4 SECONDARY AIR OPENINGS LOW WATER CUT OFF FITTING...
Page 23: ...22 DIAGRAM 6 GENERAL ASSEMBLY...
Page 24: ...23 Diagram 7 FLUE PIPE CONNECTION Diagram 8 MINIMUM INSTALLATION CLEARANCES...
Page 25: ...24 Diagram 9 CONTROL PANEL...
Page 26: ...25 Diagram 10A FIELD WIRING...
Page 27: ...26 Diagram 10B FIELD WIRING WITH LOW WATER CUT OFF...
Page 28: ...27 Diagram 11...
Page 29: ...28 Diagram 13A...
Page 30: ...29 Diagram 13B...
Page 31: ...30 Diagram 14 WOOD ADD ON WIRING...
Page 32: ...31 Diagram 15A...
Page 33: ...32 Diagram 15B...
Page 34: ...33 Diagram 16A TYPICAL PIPING ZONING WITH CIRCULATORS...
Page 35: ...34 Diagram 16B TYPICAL PIPING ZONING WITH ZONE VALVES...
Page 36: ...35 Diagram 17 Diagram 18...
Page 37: ...36 Diagram 19 Diagram 20...
Page 38: ...37 Diagram 21 SHAKER GRATE INSTALLATION PROCEDURE...
Page 39: ...38 Diagram 22 GRATE INSTALLATION PROCEDURE Diagram 23 CASTING INSTALLATION...
Page 41: ...40 Diagram 24 SECONDARY AIR SYSTEM GENERAL ASSEMBLY...
Page 42: ...41 Diagram 25 SECONDARY AIR SYSTEM INSTALLATION...