1
GENERAL INSTRUCTIONS
It is the responsibility of the consignee of the unit to examine the package for damage and, if found, to
note the same on the carriers bill of lading.
Package
Description
Included With
#1 - (P/N 5020001C/LCor A/LC )
Water Jacket c/w Doors
Draft Regulator
All
#2 – (P/N 5020015)
Ashpit c/w Door
All
#3 - (P/N 5020006)
Box Containing:
Casing and Insulation
Tube Brush & Handle
All
#4 - (P/N 5020008)
Box Containing:
Stack Box
Stack Gasket
Draft Fan & Wire Harness
Control Panel
Limit Control Wire Harness
All
#5 - (P/N 5020009)
Control Package:
1 – L4063B1007 Aquastat c/w Well or L4081B1112
1 – L6007A1029 Aquastat c/w Well
1 – Filler Valve
1 – Relief Valve
1 – Tridicator
1 – N.O. Zone Valve
1 – Low Water Cut-Off Control
All
#6
1 Box c/w 5 Brick 2 ½” x 4 ½” x 9”
All
#7
5 Boxes c/w 6 Brick ea box 1 ¼” x 4 ½” x 9”
All
#8 - (P/N 5020002SS)
Box Containing:
Oil Chamber Attachment & Burner Wire Harness
2 – 8” x 16 1/4” Castings
Heat Shield Assly
Stainless Steel Baffle & Supports
WMO Switch
1 – L4063B1007 Aquastat c/w Well or L4081B1112
Combinations
#9
Oil Burner Package:
Oil Burner
Nozzle
Combinations
#10 - (P/N 5020007)
Grates, Grate Support, Shaker Handle, Ashdoor Air
Deflector
Optional Grate Pkg #1
#11 – (P/N 5020017)
Shaker Grates, Grate Support, Shaker Handle, Ashdoor
Air Deflector
Optional Grate Pkg #2
#12 - (P/N 2190047-J)
5 GPM Domestic Hot Water Coil
Optional
Summary of Contents for BC 160
Page 21: ...20 DIAGRAM 4 SECONDARY AIR OPENINGS LOW WATER CUT OFF FITTING...
Page 23: ...22 DIAGRAM 6 GENERAL ASSEMBLY...
Page 24: ...23 Diagram 7 FLUE PIPE CONNECTION Diagram 8 MINIMUM INSTALLATION CLEARANCES...
Page 25: ...24 Diagram 9 CONTROL PANEL...
Page 26: ...25 Diagram 10A FIELD WIRING...
Page 27: ...26 Diagram 10B FIELD WIRING WITH LOW WATER CUT OFF...
Page 28: ...27 Diagram 11...
Page 29: ...28 Diagram 13A...
Page 30: ...29 Diagram 13B...
Page 31: ...30 Diagram 14 WOOD ADD ON WIRING...
Page 32: ...31 Diagram 15A...
Page 33: ...32 Diagram 15B...
Page 34: ...33 Diagram 16A TYPICAL PIPING ZONING WITH CIRCULATORS...
Page 35: ...34 Diagram 16B TYPICAL PIPING ZONING WITH ZONE VALVES...
Page 36: ...35 Diagram 17 Diagram 18...
Page 37: ...36 Diagram 19 Diagram 20...
Page 38: ...37 Diagram 21 SHAKER GRATE INSTALLATION PROCEDURE...
Page 39: ...38 Diagram 22 GRATE INSTALLATION PROCEDURE Diagram 23 CASTING INSTALLATION...
Page 41: ...40 Diagram 24 SECONDARY AIR SYSTEM GENERAL ASSEMBLY...
Page 42: ...41 Diagram 25 SECONDARY AIR SYSTEM INSTALLATION...