![Newmac BC 160 Installation, Operating And Service Manual Download Page 16](http://html1.mh-extra.com/html/newmac/bc-160/bc-160_installation-operating-and-service-manual_1679761016.webp)
15
Diagram #2
NON-COMBUSTIBLE BASE
Note: This unit is designed and approved to be placed on a non-combustible floor. This diagram shows
how such a typical base can be made if the boiler room has a combustible floor.
Consult also CMHC Bulletin NHA 5178 78/08, Heating with Wood Safely. Also consult local authorities
before installing units in rooms with combustible floors.
Summary of Contents for BC 160
Page 21: ...20 DIAGRAM 4 SECONDARY AIR OPENINGS LOW WATER CUT OFF FITTING...
Page 23: ...22 DIAGRAM 6 GENERAL ASSEMBLY...
Page 24: ...23 Diagram 7 FLUE PIPE CONNECTION Diagram 8 MINIMUM INSTALLATION CLEARANCES...
Page 25: ...24 Diagram 9 CONTROL PANEL...
Page 26: ...25 Diagram 10A FIELD WIRING...
Page 27: ...26 Diagram 10B FIELD WIRING WITH LOW WATER CUT OFF...
Page 28: ...27 Diagram 11...
Page 29: ...28 Diagram 13A...
Page 30: ...29 Diagram 13B...
Page 31: ...30 Diagram 14 WOOD ADD ON WIRING...
Page 32: ...31 Diagram 15A...
Page 33: ...32 Diagram 15B...
Page 34: ...33 Diagram 16A TYPICAL PIPING ZONING WITH CIRCULATORS...
Page 35: ...34 Diagram 16B TYPICAL PIPING ZONING WITH ZONE VALVES...
Page 36: ...35 Diagram 17 Diagram 18...
Page 37: ...36 Diagram 19 Diagram 20...
Page 38: ...37 Diagram 21 SHAKER GRATE INSTALLATION PROCEDURE...
Page 39: ...38 Diagram 22 GRATE INSTALLATION PROCEDURE Diagram 23 CASTING INSTALLATION...
Page 41: ...40 Diagram 24 SECONDARY AIR SYSTEM GENERAL ASSEMBLY...
Page 42: ...41 Diagram 25 SECONDARY AIR SYSTEM INSTALLATION...