User Manual LKG 610
12
Preparation for Use
The LKG 610 includes a test lead, part # 503, for measuring Cord Resistance and Case
Leakage. Connect the LKG 610 to a 110 VAC outlet (or 220 VAC outlets for the 220
Volt Model).
During the initial setup the last digit of the LCD will change gradually due to the time
constant of the RMS to DC converter. The display will stabilize to zero in a few
seconds.
There are 2 models of LKG 610 available. Prior to using the device identify the Part
number and the model purchased.
The following are the part numbers and the operational voltages.
1. PN: 535-110, for 110 Volt devices only.
2. PN: 535-220, for 220 Volt devices only.
Before proceeding with any measurement become familiar with the measurements and
the function selector switch.
CAUTION
Make sure that the power requirements of the Device Under Test are within the
power ratings of the LKG 610, 15 amps at 110 volts and 10 amps at 230 volts.
Do not leave the Device Under Test continuously turned on and connected to the
LKG601
.
Before testing 220 Volt devices make sure the LKG 610 is plugged to a 220 Volt
out let using the adapter and connect the 220 Volt device to the LKG 610 using
the universal adapter supplied
Do not attempt to open the LKG 610. There are no user serviceable parts inside.
Further, the warranty will be void if the unit is opened by anybody other than
Netech trained personnel.